Similar Projects
Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

East Plum Creek Reach 6 Stabilization Project
Infrastructure
Bidding
Castle Rock, CO 80104

Traffic Signal Installation Project at Fairview Parkway and Grace Boulevard
Infrastructure
Bidding
$4,000,000 CJ est. value
Highlands Ranch, CO 80126

2021 Community Roadwork
Infrastructure
Post-Bid
Highlands Ranch, CO 80126

2021 Miscellaneous Concrete Replacement Project
Infrastructure
Post-Bid
Castle Rock, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

On Call Region 1 Asphal Paving Services
Results

Promenade at Castle Rock
New Construction - 699,400 SF
Construction
Castle Rock, CO 80108

Water Well A-6 Complex - The Pinery Water and Wastewater District
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Castle Rock, CO 80104

Kime Ranch / Parker
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Parker, CO 80138

Millers Landing Hotel
New Construction, Infrastructure
Design
$89,500,000 CJ est. value
Castle Rock, CO 80104

Open Space Trail and Trailhead Maintenance
Alteration
Post-Bid
CO

Crooked Stick Widening Project - Phase 2
Results
$350,000 est. value
Lone Tree, CO

King Soopers at RidgeGate / Lone Tree
New Construction, Infrastructure - 150,000 SF
Pending Verification
$40,000,000 CJ est. value
Lone Tree, CO 80124

Last Updated 11/22/2022 08:38 AM
Project Title

Pronghorn Park and Disc Golf Course

Physical Address View project details and contacts
City, State (County) Castle Pines, CO 80108   (Douglas County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Golf Course, Park/Playground, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,012,129 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 22, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The work performed under this contract generally consists of construction of an 18-hole disc golf course along with grading for a gravel access road, parking lot, and trailhead facilities. The trailhead facilities primarily consist of a shade shelter, restroom, seating, bike racks, stone wall, and signage. The parking lot will include a portion of permeable pavement. Two (2) water quality rain gardens will be constructed. A 12'x6' concrete box culvert is to be constructed at the access road crossing of Parkway Tributary. Buyer's Requirements General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - Material Safety Data Sheets Required - Samples Required - Spill Containment Plan Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Bid security for construction contracts in any amount greater than $50,000 but less than $500,000 shall be in an amount that covers 5 percent (5%) of the estimated project cost. Bid security for construction contracts in any amount greater than $500,000 shall be in an amount that covers 10 percent (10%) of the estimated project cost. of the Bid price, made payable to the City of Castle Pines, which shall be considered as liquidated damages and shall be forfeited to the City if said Bid is accepted and the Bidder fails to execute the Contract Documents section within ten (10) calendar days after the Award by the City. Questions shall be submitted in writing via email to Jeff Binning at jeff@merge-team.com. Any questions received after 3:00 PM on Friday, October 14, 2022 will not be answered. The City will produce an addendum responding to all questions by 3:00 PM local time on Monday, October 17th, 2022.

Details

Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Lockers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Facility Sanitary Sewerage, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents