Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

2020 SB1 Improvements
Infrastructure
Bidding
Newman, CA

SJC General Aviation Run Up Pad Relocation
Term Contract, Alteration
Bidding
$1,386,000 est. value
San Jose, CA

Levee Maintenance Project
Infrastructure
Post-Bid
Stockton, CA 95214

Repair Failing Slope
Infrastructure
Post-Bid
$275,400 est. value
CA

Compost Leachate Pond Improvements
Renovation
Results
$1,900,000 est. value
Auburn, CA 95603

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

Riverside Levees Pl 84-99 Rehabilitation Project
Renovation, Infrastructure
Design
$25,000,000 to $100,000,000 est. value
Riverside, CA

Industry Day - American River Common Features 2016, Sacramento River East Levee (SREL), Contract 4
Alteration
Bidding
Sacramento, CA

Roadway Excavation, Place HMA (Type A), and Alternative Pipe Culvert
Infrastructure
Post-Bid
$76,000,000 est. value
Olancha, CA

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Install Rock Slope Protection and Roadway Excavation
Infrastructure
Bidding
$1,410,000 est. value
CA

Seventh Avenue Arrowhead Drive Road Improvement
Alteration
Post-Bid
Victorville, CA

Upper Mormon Slough Critical Erosion Repair
Infrastructure
Results
$5,387,900 to $6,136,214 est. value
Escalon, CA 95320

Reported 02/17/2022 12:00 AM
Project Title

Millbrae and Burlingame Shoreline Area Protection and Enhancement

Physical Address View project details and contacts
City, State (County) Millbrae, CA 94030   (San Mateo County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The primary objective of the project is to protect the Millbrae-Burlingame Bay shoreline and the creeks that drain to it against the FEMA 100-year flood event with approximately 6 feet of sea level rise (equal to approximately 10 feet above today’s high tide). This objective removes properties from the FEMA Special Flood Hazard Area designation and establishes long-term regional resilience against sea level rise. Other key objectives include enhancements to recreational trails and ecosystems within the project area. OneShoreline requests proposals from qualified consultants to complete 100% design, environmental compliance, and permitting for the Millbrae-Burlingame Shoreline Area Protection Project (Project), advancing the effort to the point of a shovel-ready construction project. Generally, the major tasks of this RFP include: • Identify and close the data gaps necessary to complete engineering design, environmental clearances and construction; • Develop project alternatives and 100% design of a preferred alternative; and • Complete the development of a Draft and a Final Environmental Impact Report as required by CEQA, all documentation required to secure necessary environmental permits, and, if required, documentation required pursuant to NEPA.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents