Similar Projects
Boiler Replacement, Agawam Junior High School, MSBA Accelerated Repair Program - Filed Sub-Bids
Sub-Bidding
Less than $850,000 est. value
Feeding Hills, MA

J--Electrical Services BOA
Post-Bid

Electric Conductor Cable
Term Contract
Post-Bid
Less than $50,000 est. value
Westfield, MA

Advanced Contract Initiative (ACI) Temporary Emergency Power (TEMP)
Results

Removal and Replacement of Governors of Hydroelectric Units
Results
Westfield, MA

Sheriff’s Department Hampden Wishes to Enter into a Contract for an Upgrade of the Controls, Old Enercon
Post-Bid
Less than $60,000 est. value
Ludlow, MA

Kelly Elementary School Window Replacement - Filed Sub Bids
Results
$4,127,685 est. value
Holyoke, MA

Temporary Rental Generators
Post-Bid
Ludlow, MA

Aeration Upgrades Project - General Bid
Results
Less than $450,000 est. value
Chicopee, MA

Massmutual Center VAV Box Replacement - Filed Sub Bids
Post-Bid
Less than $640,500 est. value
Springfield, MA

Aeration Upgrades Project - Sub Bid
Results
Less than $450,000 est. value
Chicopee, MA

Materials for Electric Distribution Reclosers and Control Cabinets
Post-Bid
$75,000 est. value
Westfield, MA

Kitchen Cabinet & Electrical Work - Filed Sub-Bids
Results
$1,200,000 est. value
Springfield, MA 01101

Electric Distribution - General Services Construction Contract
Post-Bid
Less than $600,000 est. value
Westfield, MA

Roger Reed Fish Hatchery, Electrical Service Upgrade
Results
Less than $23,000 est. value
Palmer, MA

Last Updated 02/14/2019 01:31 PM
Project Title

Panelboard and Kitchen/Bathroom GFCI Replacement at Inward Commons (667-2)

Physical Address View project details and contacts
City, State (County) East Longmeadow, MA 01028   (Hampden County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $181,323
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required Replacement of existing main distribution panelboards and apartment load centers, as well as replacement of existing bathroom receptacles with GFCI type. Existing kitchen outlets will remain and be connected to GFCI circuit breakers in the new panelboards
Details
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents