Similar Projects
Tapestry Collection by Hilton / Rogers
New Construction, Infrastructure - 56,300 SF
Conception
$17,000,000 CJ est. value
Rogers, AR 72758

8th Street Commercial Buildings
New Construction, Infrastructure
Conception
$5,800,000 CJ est. value
Rogers, AR 72758

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Design
$12,100,000 CJ est. value
Rogers, AR 72758

Hangar Development
Infrastructure
Bidding
$590,000 CJ est. value
Bentonville, AR 72712

Walmart Campus Hotel (NEO Hotel) and Welcome Center
New Construction, Infrastructure - 3,000 SF
Bidding
$55,000,000 CJ est. value
Bentonville, AR 72712

Construction of AWIN Tower Site Work Designs
Infrastructure
Post-Bid
Little Flock, AR

Sugar Creek Remodel
Renovation
Post-Bid
Bentonville, AR

Water Treatment Plant Improvements 4.0 MG Composite Elevated Storage Tank
Infrastructure
Results
$13,141,000 CJ est. value
Rogers, AR 72756

Lake Francis Street Rebuild
Infrastructure
Results
$2,169,551 CJ est. value
Siloam Springs, AR 72761

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

SW 4th and B Street Townhomes
New Construction, Infrastructure - 10,451 SF
Construction
$2,000,000 CJ est. value
Bentonville, AR 72712

Morning Star Subdivision
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Bentonville, AR 72712

Jiffy Trip #721 / Rogers
New Construction, Infrastructure
Pending Verification
$1,430,000 CJ est. value
Rogers, AR 72756

Twenty-Second Street Business Park
New Construction, Infrastructure - 20,312 SF
Conception
$3,300,000 CJ est. value
Rogers, AR 72756

Last Updated 12/08/2022 02:02 PM
Project Title

Rogers Elementary #17

Physical Address View project details and contacts
City, State (County) Rogers, AR 72756   (Benton County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Abandoned, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Architect - 11/18/22
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 8th, 2022 - this project has been cancelled. **"Save the Date"** Flintco has been selected as the CMAR for the new Rogers Elementary #17 in Rogers, AR. This bid will include all work associated with a new 2-Story 86,454 SF elementary school. This invitation serves as a "Save the Date" for this project. Plans are not yet available, however final CD drawings for bid will be issued by November 18, 2022 If you have any questions about the project documents, please don't hesitate to reach out to Jonathan Williams (479) 236-8164, jonathan.williams@flintco.com , Klint Kimball (479) 306-6305, klint.kimball@flintco.com or Patrick Horath @ phorath@flintco.com.

Details

2 Stories Above Grade, 86,454 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents