Similar Projects
Hudson Place Mixed Use
New Construction - 25,000 SF
Design
Newburgh, NY 12550

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

South Glens Falls WTP Upgrades - Contract 2
Bidding
South Glens Falls, NY

Water Source Improvements
Renovation
Bidding
$190,000 to $825,000 est. value
Crown Point, NY

Water Pollution Control Facility Building No.1 Building Elevator Modernization
Post-Bid
Amherst, NY 14221

Plattsburgh Base Water District Improvements 2020
Post-Bid
Plattsburgh, NY 12159

Water Plant Fluoride Room Addition
Addition
Results
Less than $320,000 est. value
Williamson, NY 14589

Upgrades to the Water Treatment Plant's Junction Chamber and Pretreatment Buildings (AS)
Results
Yonkers, NY 10703

Wastewater Treatment Plant Nutrient Removal and Disinfection Improvements
Construction
Less than $3,000,000 est. value
Painted Post, NY 14870

Corfu Wastewater Treatment Facility Expansion
Construction
Less than $4,350,000 est. value
Corfu, NY 14036

Water Dynamic Corp Storage Building
New Construction, Renovation - 2,291 SF
Pending Verification
Less than $500,000 CJ est. value
Southold, NY 11971

Wayne County Regional Water Storage Project - Miscellaneous Upgrades 2021
New Construction
Bidding
$210,000 to $650,000 est. value
Walworth, NY

Wastewater Treatment Plant Protective Measures - Contract 68
Post-Bid
Niagara Falls, NY

Wastewater Treatment Plant Flood Mitigation
Results
Endicott, NY 13760

Water Treatment Facility Upgrade
Construction
Millbrook, NY 12545

Last Updated 12/07/2021 09:41 AM
Project Title

Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Rouses Point, NY 12979   (Clinton County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Construction Documents, Bidding Expected April 2022
Bids Due View project details and contacts
Estimated Value $7,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will consist of demolition and removal of old plant; design and construction of a new treatment plant building; design and construction of a new raw water pump station building; a sanitary sewer connection; furnish and install 16" and 12" ductile iron pipe and fittings; furnish and install raw water vertical turbine pumps, effluent vertical turbine pumps, VFD and Controls; furnish membrane microfiltration units; process piping; chemical fee and storage system; electrical and generator; SCADA System; work zone traffic control; erosion and sediment control.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents