Similar Projects
2022 Countyline and Lucent Boulevard Intersection Improvements
Infrastructure
Bidding
$1,000,000 est. value
Highlands Ranch, CO 80129

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

2021 Community Roadwork
Infrastructure
Post-Bid
Highlands Ranch, CO 80126

Peoria Street Widening Project
Results
Less than $1,058,887 est. value
Castle Rock, CO

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

2021 Woodmoor Mountain Road Project
Infrastructure
Post-Bid
CO

2021 Townwide Resurfacing Program
Results
Parker, CO

2021 Miscellaneous Concrete Replacement Project
Infrastructure
Post-Bid
Castle Rock, CO

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Mainstreet and Twenty Mile Road Intersection Improvements
Infrastructure
Post-Bid
CO 80138

2021 Street Overlay
Results
Lone Tree, CO

Jordan Road - Roadside Improvements - Hess Road to Bradbury Parkway
Infrastructure
Post-Bid
$200,000 est. value
Parker, CO 80138

2021 Asphalt Overlay
Results
Less than $3,987,537 est. value
Castle Rock, CO

2022 Road Repairs and Surfacing
Infrastructure
Post-Bid
$500,000 est. value
Castle Rock, CO

Concrete Pavement Restoration Project
Results
Less than $1,513,428 est. value
Castle Rock, CO

Last Updated 05/25/2022 01:18 PM
Project Title

Ridge Road Widening

Physical Address View project details and contacts
City, State (County) Castle Rock, CO   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes removal/replacement of existing pavement including concrete and asphalt pavement, earthwork, crosspan, sidewalk, curb and gutter, ADA curb ramps, landscaping and irrigation, signing and striping, drainage inlets and storm drain, resetting traffic signals, and hot mix asphalt paving and patching. Contractor will be required to coordinate construction activities with trash removal companies, school district, HOA and Metro Districts if applicable. The Contractor shall supply all labor, materials and equipment necessary to complete the work in accordance with these specifications. The contractor shall commence work no later than ten (3) calendar days from, and including, the date of the Notice to Proceed, and be construction complete (punchlist items, cleanup, and demobilize) within 170 calendar days from the date on the Notice to Proceed. If “Construction Completion” is not issued within the allotted contract time for the original scope of work, “Liquidated Damages” shall be assessed. When contract work is complete, the contractor shall commence work on punchlist items, cleanup, and demobilizing regardless of contract time remaining. Work shall take place between April 25, 2022 and October 31, 2022. A schedule of sequencing of all work shall be submitted at or before the project pre-construction meeting, and approved by the Town prior to issuance of the Notice to Proceed and should not leave the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents