Similar Projects
Last Updated | 05/25/2022 03:28 AM |
Project Title | Asphalt Repairs and Crack Filling |
Physical Address | View project details and contacts |
City, State (County) | Hamburg, MI (Livingston County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To perform the following repairs to the Mike Levine Lakelands Trail in Hamburg Township: • Saw-cut and replace with 3” of compacted 1100 Hot Mix Asphalt, all portions of the Lakelands Trail identified with yellow caution paint. • Clean and fill with 3405 hot butyl rubber crack filler all asphalt cracks marked with yellow caution paint. • Install retaining walls consisting of 4” by 6” Wolmanized, pressure treated wood posts to a depth of 48” and install 2” by 6” Wolmanized, pressure treated tongue and grove planking to mirror retaining walls currently installed along the trail in all areas marked with yellow caution paint on the trail. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |