Similar Projects
Chlorine Booster Station
Renovation
Bidding
$200,000 est. value
Marshall, MO

L51 and L52 Pump Station (P-717 and P-718) - Odor Control (IR)
New Construction
Bidding
$1,422,000 est. value
Saint Louis, MO

North Union Street Sanitary Sewer and Lift Station and North Industrial Park Sanitary Sewer Extension
Infrastructure
Post-Bid
Jackson, MO 63755

11th Plat Pump Station Repairs 2021
New Construction
Post-Bid
Kansas City, MO

FF Highway Pump Station Retrofit
New Construction
Results
Parkville, MO

Raw Water Pump Station, Value Vault and Zebra Mussel Control
Renovation
Results
Smithville, MO

Reservoir Pump Station Improvements
Infrastructure
Bidding
$90,000 to $130,000 est. value
Trenton, MO 64683

Pump Station
New Construction
Post-Bid
California, MO

15th Street Pump Station Upgrade and Sewer Separation
Demolition
Results
Kansas City, MO

Wastewater Treatment Facility Improvements
Renovation
Bidding
$5,000,000 est. value
Leeton, MO

Pelham and Central Regional Lift Station
New Construction
Post-Bid
Sedalia, MO

Water Plant Filter Gallery and Return Sludge Pump Station Pipe Coating
Renovation
Results
Saint Peters, MO 63376

Platte County Regional Sewer District Pump Station Replacement - 2022
Renovation
Bidding
$300,000 est. value
Platte City, MO

Electrical Substation Upgrade
New Construction
Post-Bid
Independence, MO 64050

Wastewater Treatment Facility Improvements
New Construction, Infrastructure
Results
Laredo, MO

Last Updated 05/13/2022 03:09 PM
Project Title

Kimbeland Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Jackson, MO   (Cape Girardeau County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the Kimbeland Pump Station Improvements Project in general consists of the following: 1. Removal/abandonment of the existing below grade steel dry-pit pump station structure/equipment; existing 6’ by 6’ reinforced concrete wet well; connecting 36” RCP; bypass pumping portal, electrical control/power panels; and miscellaneous sitework/utility modifications. 2. Rehabilitation and modification of the existing 7’ diameter flat-top manhole. 3. Installation of approximately 60’ of 10” DIP Hwy. 61 East Pump Station bypass force main, 22’ of 12”PVC force main, and all required fittings, valves, thrust blocks, etc. 4. Installation of approximately 290’ of 16” DIP and 34’ of 15” PVC gravity sewer lines with four (4) new manholes. 5. Installation of buried electrical conduits, hand holes, sectionalizing cabinets and transclosure. 6. Construction of a new duplex submersible pump station with wet well/valve vault; emergency generator, new electrical/water/phone service connections; site improvements/fencing; connection to existing 12” force main; and all other miscellaneous work and appurtenances necessary to complete the project. 7. Construction of new on-line detention storage to serve new duplex submersible pump station.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents