Similar Projects
US 101/Schaerer Creek to Hood Canal - Remove Fish Barrier
Infrastructure
Conception
$2,661,000 CJ est. value
Cosmopolis, WA 98537

US 101/Schaerer Creek to Hood Canal - Remove Fish Barrier
Infrastructure
Conception
$2,661,000 CJ est. value
Cosmopolis, WA 98537

US 12/Satsop River Bridge EB - Bridge Painting
Renovation, Infrastructure
Design
$4,410,000 CJ est. value
Aberdeen, WA 98520

US 101/Chicken Coop Creek - Remove Fish Barrier
Infrastructure
Design
$2,472,000 CJ est. value
Cosmopolis, WA 98537

High Dune Trail - Damon Road to Chance A La Mer
Infrastructure
Bidding
$950,000 CJ est. value
Ocean Shores, WA 98569

SR 109 W of Hoquiam Stabilize Slope
Infrastructure
Bidding
$600,000 CJ est. value
Hoquiam, WA 98550

Lower Satsop Right Bank Conservation
Infrastructure
Post-Bid
Montesano, WA

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Miller Junior High School Site Preparation for Covered Area
Infrastructure
Results
Aberdeen, WA 98520

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

Satsop Haul Road Emergency Erosion Protection
Infrastructure
Construction
$305,312 CJ est. value
Aberdeen, WA 98520

SR 109/N of Moclips Highway - Stabilize Slope
Infrastructure
Design
$1,824,000 CJ est. value
Hoquiam, WA 98550

Point Brown Pedestrian Crossing
Infrastructure
Bidding
$244,000 CJ est. value
Ocean Shores, WA 98569

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Northeast Neighborhood Development Phase One
Infrastructure
Results
$11,881,570 CJ est. value
Aberdeen, WA 98520

Last Updated 01/05/2023 03:31 AM
Project Title

SR 105/S of Fairmount Ave - Culvert Replacement

Physical Address View project details and contacts
City, State (County) Aberdeen, WA 98520   (Grays Harbor County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $2,945,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing culvert in this location is experiencing failure. Replace or repair the existing culvert to provide improved drainage and preserve the structural integrity of the roadway. As of January 05, 2023, this project is in Conceptual status. Preliminary engineering has begun and environmental design is expected to be complete in the third quarter of 2025. The contract advertisement is expected in first quarter of 2026 and construction is anticipated to be operationally complete in the third quarter of 2027. WSDOT - SR 105/S of Fairmount Ave - Culvert Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents