Similar Projects
Autonomous Vehicle Testing Center
New Construction
Conception
$30,000,000 to $35,000,000 est. value
Frostburg, MD

The Estates at Rosehaven Manor
New Construction
Design
Frederick, MD 21701

Rosewood Technology Center
New Construction
Design
Owings Mills, MD 21117

Prime Contracting Services for the Utilities Upgrades and Site Improvements Project Phase II
Bidding
Baltimore, MD

Mace Medical Offices
New Construction - 14,400 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Dundalk, MD 21222

Demolition And Site Improvement
Demolition
Post-Bid
Suitland, MD 20746

Statewide Drilling Support Contract (Multiple Award)
Results
$2,500,001 to $5,000,000 est. value
MD 21076

Land Clearing for Construction of a New Pole Barn and Bus Parking Lot
Results
Less than $122,571 est. value
Denton, MD 21629

Kellerton Knolls Land Bay A
New Construction
Construction
Frederick, MD 21701

Lexington Park Ford
New Construction - 30,000 SF
Construction
$6,500,000 est. value
California, MD 20639

745 Annapolis Neck Road Development
New Construction
Pending Verification
Annapolis, MD

Salt Life Park Expansion
Pending Verification
Ocean City, MD 21842

Lakeside At Trappe Master Plan
New Construction
Design
Trappe, MD

SWM Pond Retrofit (MD Dam No 496)
Renovation
Post-Bid
Germantown, MD 20874

Site Preparation and Development
Results
Annapolis, MD 21401

Last Updated 08/04/2020 04:09 PM
Project Title

City Service Center Wash Rack

Physical Address View project details and contacts
City, State (County) Salisbury, MD 21802   (Wicomico County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to install a vehicle wash rack pad at the City Service Center located at 500 Mack Ave, Salisbury, MD 21801. Work includes mobilization and demobilization, installing City provided Fox Diverter and Demand valves, furnish and install cleanouts, sewer and stormwater lines, water supply line between Diverter valve and Demand valve. City will be responsible for stakeout and excavation, Successful Vendor will provide and place wash rack base material, 6-inch concrete pad with reinforcing bars, sidewalk, monolithic curb, curb and gutter, asphalt patching and site grading.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents