Similar Projects
Rancho Buena Vista Condominiums
New Construction - 1,120,000 SF
Conception
$10,000,000 CJ est. value
Lake Havasu City, AZ

Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

Esperanza Phase II Landominiums
New Construction
Design
Lake Havasu City, AZ 86405

Cien Agaves Landominiums
New Construction
Design
Lake Havasu City, AZ 86405

New Kingman/ Butler Sewer Expansion Project
Infrastructure
Bidding
$11,500,000 CJ est. value
Kingman, AZ 86401

General Contractor for 30 LIHTC Single-Family Units 2,3, and 4 Bedrooms
New Construction, Infrastructure
Bidding
$510,000 CJ est. value
Peach Springs, AZ 86434

Box Canyon Excavating of 3 House Pads
Infrastructure
Post-Bid
Peach Springs, AZ

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Animal Shelter Trenching
Infrastructure
Results
Kingman, AZ 86409

Dick Samp Park Pickleball Courts - Phase 3
Infrastructure
Results
$96,117 CJ est. value
Lake Havasu City, AZ 86404

Riverwalk Condominiums
New Construction - 118,300 SF
Construction
$4,277,000 est. value
Lake Havasu City, AZ 86403

Mastro's Condominiums
New Construction - 67,400 SF
Construction
$2,290,000 est. value
Lake Havasu City, AZ 86403

The Havasu Life North / Bimini Lane Townhomes
New Construction
Pending Verification
Lake Havasu City, AZ 86403

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

Main Tanks Transmission Line Phase II - City of Kingman
Infrastructure
Conception
$2,100,000 CJ est. value
Kingman, AZ 86401

Last Updated 10/21/2022 06:03 PM
Project Title

RFP D/B - Two Single-family Homes in Peach Springs

Physical Address View project details and contacts
City, State (County) Peach Springs, AZ 86434   (Mohave County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Tribe invites interested firms to submit written Proposals relating to this project. A Selection Committee of five (5) individuals will evaluate and score Offeror's qualifications and experience with similar projects. The Tribe will select the top-rated Offeror from those submitting Proposals and enter into contract negotiations. The project shall utilize a negotiated Guaranteed Maximum Price (GMP). Funds are derived from the BIA Housing Improvement Program. The new homes must be ready for occupancy no later than six (6) months after contract's Notice to Proceed is given. QUESTIONS SHALL BE DIRECTED TO: Kevin A. Davidson Planning and Economic Development Director (928) 769-1310 kevin.davidson@hualapai-nsn.gov Written questions regarding this RFP must be received by the Planning Department no later than October 3, 2022. Questions may then be responded to by written amendment to this document. Oral statements or instructions shall not constitute an amendment to the RFP The Tribe reserves the right to reject any or all submittals, or to withhold the award for any reason it may determine, and to waive or not to waive any informalities in any submittal. All information regarding the content of the specific submittals will remain confidential until a contract is finalized or all proposals are rejected.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents