Similar Projects
Re-Roofing and Package Air Conditioning Equipment, AL 2-12 Central Plaza Towers, 302 Building
Bidding
Mobile, AL 36607

Replacement of Cafeteria HVAC at Sheffield High School for the School City District
Bidding
Sheffield, AL 35660

Volker Hall, 5th Floor, Air Handler Replacement
Post-Bid
$210,000 to $245,000 est. value
Birmingham, AL 35233

Chiller Maintenance Service Various Schools
Post-Bid
Mobile, AL 36618

HVAC Maintenance, Service and Replacement Project
Results
Dothan, AL

J--HVAC Units Replacement w/Connection to Siemens Building Automation System, Currently in Place at the Station.
Results
Tuscaloosa, AL 35404

HVAC Renovations at Brewbaker Junior High School
Bidding
Montgomery, AL 36116

Tuscaloosa Fire Station #1 HVAC Upgrades Project
Post-Bid
Tuscaloosa, AL 35401

Coleman Coliseum Service Level HVAC Replacement
Results
$200,000 to $400,000 est. value
Tuscaloosa, AL

Mechanical Upgrades for Young Hall and Bell Conference Center
Bidding
Livingston, AL 35470

Capitol HVAC Repair and Controls Upgrade Capitol Operations
Post-Bid
Less than $850,000 est. value
Montgomery, AL 36130

Replacement of HVAC Units
Results
Selma, AL 36703

Ferguson Center - Chick-Fil-A
Bidding
$100,000 to $160,000 est. value
Tuscaloosa, AL 35404

Cleaning of Hoods and Vents
Post-Bid
Birmingham, AL 35294

Marine AC Unit 30,000 BTU
Results
Huntsville, AL 35899

Reported 03/30/2021 12:00 AM
Project Title

Chiller Repairs

Physical Address View project details and contacts
City, State (County) Aliceville, AL 35442   (Pickens County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all parts, materials and services to properly repair the components of the existing York 500-ton centrifugal chillers that were installed in 2011. The chillers are still within their life-cycle, but are experiencing mechanical failures that cannot be prevented with routine maintenance and servicing. Chiller #1 experienced a power surge, and is currently inoperable requiring a variable speed drive (VSD) and motor replacement. Chiller #2 was repaired in 2018, but is now leaking oil at the drive shaft and other components.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers, Centrifugal Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents