Similar Projects
Canyon Wren Townhomes - General Contractor Bids Needed
New Construction, Infrastructure - 30,000 SF
Design
$7,000,000 CJ est. value
Moab, UT 84532

UT NP MULTI PMS(2) & NV NP GRBA PMS(1), Pavement Preservation Southern Utah and Pavement Preservation Great Basin
Infrastructure
Design
$10,000,000 CJ est. value
Moab, UT 84532

RFQ Contractor - Canyon Rims Road
Infrastructure
Bidding
$10,000,000 CJ est. value
Moab, UT 84532

Tusher Area Sewer Improvements Project
Infrastructure
Bidding
$400,000 CJ est. value
Moab, UT 84532

Moab Regional Hospital Bid Package 1
New Construction, Alteration
Post-Bid
Moab, UT 84532

RFQ Contractor - La Sal Mountain Loop Road
Infrastructure
Post-Bid
$30,000,000 CJ est. value
Moab, UT 84532

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

I-70; W Cisco to E Cisco and Westwater to State Line
Infrastructure
Results
$6,484,551 CJ est. value
Thompson, UT 84540

The Jailhouse Cafe Expansion
Addition, Demolition, Infrastructure - 16,128 SF
Pending Verification
$2,500,000 CJ est. value
Moab, UT 84532

Aggie Apartments Phase I
New Construction, Infrastructure - 113,558 SF
Pending Verification
$124,000,000 CJ est. value
Moab, UT 84532

Birch Area Sewer Improvements Project
Infrastructure
Bidding
$400,000 CJ est. value
Moab, UT 84532

Asphalt Paving - Arches National Park
Infrastructure
Post-Bid
$250,000 CJ est. value
Moab, UT 84532

US-191; Various Location from Moab to MP 151 Preservation High Volume
Infrastructure
Bidding
$1,500,000 CJ est. value
Moab, UT 84532

The Lost Springs Apartments
New Construction, Infrastructure - 72,824 SF
Post-Bid
$30,000,000 CJ est. value
Moab, UT 84532

Pack Creek Fire Emergency Watershed Protection
Infrastructure
Post-Bid
$450,000 CJ est. value
Castle Valley, UT 84532

Last Updated 02/13/2023 04:36 PM
Project Title

Lionsback Resort

Physical Address View project details and contacts
City, State (County) Moab, UT 84532   (Grand County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Hotel/Motel, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $350,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a mixed-use development. As of February 2023, the developer has announced the project. No further plans or applications have been submitted for review at this time. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been established, however; construction is unlikely to begin prior to third quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents