Similar Projects
C. Madison, S. Blair Street / John Nolen Drive, Wilson / Williamson Street Intersection C. Madison, Blair Street / E. Washington Avenue, E. Wilson Street to Blount Street
Infrastructure
Bidding
WI

Black Earth - Sauk City, USH 14 to USH 12
Infrastructure
Bidding
WI

Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

State Highway 19 & Williamsburg Way Intersection
Infrastructure
Bidding
Deforest, WI 53532

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

Crack Routing and Sealing
Results
Madison, WI 53703

Road Work
Post-Bid
Verona, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Road Repairs
Post-Bid
WI 53572

Madison - Cambridge, Whitney Way to IH 39/90
Results
Cambridge, Madison, WI 53558

2021 Road Paving
Post-Bid
McFarland, WI

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

Last Updated 10/26/2021 03:08 PM
Project Title

HMA Pavement - State Projects

Physical Address View project details and contacts
City, State (County) Waunakee, WI   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STH 113 pavement repair north of Waunakee - RR tracks to Cuba Valley Road – Village of Waunakee, Town of Vienna. This project is to place HMA pavement as indicated below for pavement repair: Overlay thin (3/8” to 1/2”) layer of HMA 5 LT (“skinny mix”) on STH 113 approximately 9,400 ft from RR tracks to Cuba Valley Road north of Waunakee. The area to be repaired is approximately 9,400’ by 24’ (25,067 SY to be marked by Dane Co. Highway) and will require approximately 990 tons of HMA. Contractor will be directed to keep the HMA placement inside paint lines, with a focus on filling the wheel rutting. Contractor is responsible for prep work and traffic control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents