Similar Projects
I-5: Exit 125 Northbound at Garden Valley Blvd
Infrastructure
Design
$2,500,000 CJ est. value
Roseburg, OR 97470

I-5: Exit 125 Northbound at Garden Valley Blvd
Infrastructure
Design
$2,500,000 CJ est. value
Roseburg, OR 97470

City of Myrtle Creek - Riverside Pump Station
Demolition, New Construction, Infrastructure
Bidding
$1,550,000 CJ est. value
Myrtle Creek, OR 97457

City of Myrtle Creek - Riverside Pump Station
Demolition, New Construction, Infrastructure
Bidding
$1,550,000 CJ est. value
Myrtle Creek, OR 97457

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Arthur Drive Reconstruction
Infrastructure
Post-Bid
Reedsport, OR

Pruner Road Intersection Improvements
Infrastructure
Results
$2,000,000 est. value
Roseburg, OR

US101/OR38 Curb Ramps Project
Infrastructure
Results
$2,000,000 to $5,000,000 est. value

I-5: Azalea - Glendale (Southbound)
Infrastructure
Design
$4,902,000 CJ est. value
Roseburg, OR 97470

Winston Westside Sewer and Roadway Improvements
Infrastructure
Bidding
$531,000 CJ est. value
Winston, OR 97496

Coos Bay Bridge Cleaning and Brushing Services
Term Contract
Post-Bid
North Bend, Umpqua, OR 97459

OR99/OR99W/OR99E Curb Ramps Project
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
Roseburg, OR 97471

AutoZone #6128 / Sherwood
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Roseburg, OR 97470

US101 Intersection Illumination Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Reedsport, OR 97467

Douglas High School Culinary Classroom
New Construction, Infrastructure - 970 SF
Post-Bid
$908,000 CJ est. value
Winston, OR 97496

Last Updated 09/12/2022 01:01 PM
Project Title

2022 Water System Improvements

Physical Address View project details and contacts
City, State (County) Riddle, OR 97469   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $342,267 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project must be substantially complete 180 days for Schedules A, Schedule B, and Schedule C combined after issuance of Notice to Proceed. Estimated construction cost for the Basic Bid is between $285,000 and $356,000 for Schedule A, $250,000 and $315,000 for Schedule B, and $105,000 and $130,000 for Schedule C. A detailed summary of the project is listed on www.questcdn. com. The project consists of the following major items of construction: Schedule A - 3rd Avenue Improvements 1. Construct new 8-inch diameter water line, along 3rd Avenue, from Cherry Street to Maple Street, as shown on the Plans. Schedule B - 4th Avenue and Oak Street Improvements 1. Construct new 6-inch diameter water line along 4th Avenue from Oak Street to terminal end on 4th Avenue, along Oak Street from 4th Avenue to 2nd Avenue, and along 2nd Avenue from Oak Street to terminal end on 2nd Avenue, as shown on the Plans. Schedule C - 2nd Avenue South and "D" Street Improvements 1. Construct new 4-inch diameter water line, along 2nd Avenue South commencing at Main Street and continuing along "D" Street until 1st Avenue, as shown on the Plans. Bids shall be on a unit price basis for each Schedule as indicated in the Bid Form. Pre-Qualification: Yes No Bid will be considered unless fully completed in the manner provided in the Instructions to Bidders, and accompanied by a Bid Security executed in favor of the Owner in the amount of not less than 10% of the total amount of the Bid. Per ORS 279C.385 (2), Bid Security is to be forfeited as fixed and liquidated damages should the Bidder neglect or refuse to enter into a Contract and provide suitable insurance certificates, bonds, and other required documents for the faithful performance of the work in the event the Bidder is awarded the Contract. Pursuant to ORS 279C.505(2), all Bidders must certify with their Bids that they have an employee drug testing program in place. If awarded a Contract, Bidder must provide proof of such drug testing program when executed Agreements are returned to Owner. Bidders must prequalify with Owner as specified in the Instructions to Bidders, five (5) days prior to Bid opening. Each Bidder must submit a First-Tier Subcontractor Disclosure Form to the Owner within two working hours of the time for receipt of Bids in accordance with ORS 279C.370. Each Bidder must also submit Evidence of Authority to Sign Bid and Evidence to do Business in the State within two working hours of the time for receipt of the Bid. The Contractor and every subcontractor on the project shall pay at least the state prevailing rate of wage as determined under ORS 279C.815. ORS 279C.800 to 279C.870 will be administered and enforced in a manner that is consistent with state law and regulations adopted or guidelines issued in accordance with related acts. No Bid will be received or considered by the Owner unless the Bid contains: 1) a statement that Bidder will comply with the provisions of 40 USC 276a and ORS 279C.840 and 2) a statement as to whether the Bidder is a resident Bidder as defined in ORS 279A.120. The Owner reserves the right to reject any or all Bids, to waive all informalities, and to accept such Bids that in the opinion of the Owner are in the best interest of the Owner. No Bidder may withdraw or modify this Bid after the hour set for the receipt of Bids, and thereafter until the lapse of 70 days from the Bid opening.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents