Similar Projects
VOA Site C Road Gas Improvements
Infrastructure
Bidding
$90,000 est. value
Greenville, NC

Natural Gas System Expansion
Infrastructure
Bidding
$700,000 est. value
Lexington, NC

Maintenance Fuel Facility Secondary Containment Bid Package
Post-Bid
Raleigh, NC

Fuel Removal and AST STI SP0001 External Inspection at Military Ocean Terminal Sunny Point
Post-Bid
Southport, NC

ODOR Control System for Sludge Holding Tanks, Ocean Sands Wastewater Treatment Plant 200,000 GPD, Phase I
Results
$60,000 est. value
Corolla, NC 27929

Fuel Management System
Results
Less than $349,960 est. value
Jacksonville, NC 28540

Fuel Farm Improvements Project
Infrastructure
Post-Bid
Elizabeth City, NC

Nano Plant Chemical Line Replacment-Fy21-02
Results
Jacksonville, NC

Expansion of the Municipal Gas System
Infrastructure
Post-Bid
Wilson, NC

Leland Fuel Site Upgrades
Results
Leland, NC 28451

6,000 Gallon Diesel Tank
Term Contract
Post-Bid
New London, NC

Fuel Tank Inspection for USCG Base Elizabeth City, NC
Results
Elizabeth City, NC 27909

Z2GC--UST B42 & 21 Repair & Maintenance
Renovation, Infrastructure
Post-Bid
Salisbury, NC 28144

Diesel Fuel Ast Replacement
Results
Fayetteville, NC

Fuel Polishing and Tank Cleaning System
Infrastructure
Post-Bid
Raleigh, NC

Last Updated 06/02/2022 12:36 AM
Project Title

Highway 902 Pump Station Chemical Booster Station

Physical Address View project details and contacts
City, State (County) Pittsboro, NC 27312   (Chatham County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Greater than $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is located Highway 902 Pump Station - 4143 NC-902, Pittsboro, NC 27312. The Work includes, but is not limited to, the following: 1. Sodium hypochlorite storage and feed system to include a double-walled tank, day tank scale and indicator / transmitter, and two digital dosing diaphragm metering pumps. 2. Liquid ammonium sulfate (LAS) storage and feed system to include a drum scale and indicator / transmitter, and two digital dosing diaphragm metering pumps. 3. A new pre-fabricated Chemical Building installed immediately adjacent to the Pump Station to house the sodium hypochlorite and LAS storage and feed equipment, and an emergency eyewash station. 4. A chemical injection vault installed around the existing Pump Station suction piping. 5. Chloramine and pH analyzers. 6. Tempered water heater for the eyewash. 7. Associated electrical, instrumentation and controls, and mechanical work for all new facilities and associated equipment. 8. Tie-In, start-up, and commissioning of all new facilities and associated equipment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents