Similar Projects
Deer Mountain Residential Redevelopment
New Construction, Infrastructure
Conception
SD

Rout and Seal
Infrastructure
Bidding

Sky Ridge Housing Phase 2
Infrastructure
Bidding
SD

2021 Sanitary Sewer CIPP Lining
Post-Bid
Spearfish, SD 57783

Miller Ranch Subdivision Phase 1
Post-Bid
Spearfish, SD 57783

North Rochford Road and Hanna Road Mill and Asphalt Overlay - Phase 4
Results
$700,020 est. value
Central City, SD 57754

2021 Scheduled Street Repairs
Renovation
Results
$230,225 to $250,000 est. value
Spearfish, SD

Creekside ES Sidewalk and Mountain View ES Asphalt Improvement
Infrastructure
Post-Bid
Spearfish, SD 57783

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Sewer Vacuum and Pumping Equipment
Term Contract
Post-Bid
$65,000,000 est. value

Exit 8 Area Community Path Hillsview Road and S.F.P. Sports Complex
New Construction
Results
$300,000 est. value
Spearfish, SD

2022 Sanitary Sewer CIPP Lining
Infrastructure
Post-Bid
Spearfish, SD

2021 Chip Seal
Results
$295,607 est. value
Deadwood, SD

2021 Crack Sealing
Results
Less than $199,717 est. value
Spearfish, SD

Whitewood Laurel Street and Utility Improvements
Infrastructure
Results
$1,477,649 est. value
Whitewood, SD 57793

Last Updated 01/25/2022 03:26 PM
Project Title

Spearfish Sandstone Hills Street Repair and Sewer Upsize

Physical Address View project details and contacts
City, State (County) Spearfish, SD 57783   (Lawrence County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,455,000 to $1,569,460
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mill and Overlay, ADA Curb Ramp Updates, Replace Damaged Curb & Gutter, Replaced Damaged Fillet Sections, Pipe Bursting Sanitary Sewer, and Replacing Sanitary Sewer Manholes. Sandstone Hills Drive, Iron Horse Loop, and Windmill Drive in the Sandstone Hills Subdivision in Spearfish, SD

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents