Similar Projects
NM-4 Transmission Line Replacement - Los Alamos County
Infrastructure
Conception
$6,000,000 CJ est. value
Los Alamos, NM 87544

NM-4 Transmission Line Replacement - Los Alamos County
Infrastructure
Conception
$6,000,000 CJ est. value
Los Alamos, NM 87544

Flex Laboratory at the Research Park
New Construction, Infrastructure - 83,000 SF
Design
$23,000,000 CJ est. value
Los Alamos, NM 87544

33rd 34th and Arkansas Road and Utility Improvements Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Los Alamos, NM 87544

33rd 34th and Arkansas Road and Utility Improvements Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Los Alamos, NM 87544

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Source Improvements Project
Infrastructure
Post-Bid
Los Alamos, NM

Y--NM-Valle De Oro NWR-Water Control Wetland 1 & 2 On
Term Contract
Results
Albuquerque, NM 87105

Aspen School Area Phase 2 Sewer Line R and R - Los Alamos County
Infrastructure
Conception
$268,500 CJ est. value
Los Alamos, NM 87544

Golf Course Site Improvements Phase One
Infrastructure
Bidding
$200,000 CJ est. value
Los Alamos, NM 87544

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Aspen School Area Pipeline Phase 2 - Los Alamos County
Infrastructure
Conception
$831,000 CJ est. value
Los Alamos, NM 87544

Water System SCADA Study
Infrastructure
Post-Bid
Los Alamos, NM

Central Avenue - 9th Street to Round-A-Bout - Los Alamos County
Infrastructure
Conception
$351,252 CJ est. value
Los Alamos, NM 87544

Engineering Services for NM502/Trinity Drive Safety and ADA Improvements
Infrastructure
Post-Bid
$592,124 CJ est. value
Los Alamos, NM 87544

Last Updated 11/01/2022 03:04 PM
Project Title

Rose Street (Central to Peach) Utility Upgrades - Los Alamos County

Physical Address View project details and contacts
City, State (County) Los Alamos, NM 87544   (Los Alamos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

WATER PRODUCTION - Rose Street (Public Works Road Project) This project will be a joint project between DPU and the Public Works Department to re-pave the roadway and replace utility infrastructure beneath the new road. The project will be from Central Avenue to Peach Street. 1950 vintage sections of waterlines will be replaced, and some undersized gas pipelines will be replaced. The utility portion of the project will be funded by the profit transfer monies allocated to the DPU by the County Council. Project is included County of Los Alamos FY 2023 - Adopted Budgets. As of November 1, 2022, a design team has not been identified and a construction timeline has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents