Similar Projects
Last Updated | 08/12/2022 08:03 AM |
Project Title | Quail Creek Water Treatment Plant to Cottam Pump Stations and Pipeline Project |
Physical Address | View project details and contacts |
City, State (County) | St George, UT 84770 (Washington County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $12,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 12, 2022, a design engineer has been selected. Construction is anticipated to take place in the summer of 2023. *The previous solicitation is listed below for reference The Washington County Water Conservancy District (district) is seeking Statements of Qualifications (SOQs) for design and construction management services of the Quail Creek Water Treatment Plant to Cottam Pump Stations and Pipeline Project. Questions regarding this solicitation should be addressed to Randy Johnson by phone at 435.673.3617 or email at randy@wcwcd.org. Washington County Water Conservancy District (District) is a water conservancy district organized and existing under the Utah Water Conservancy Act. The District is seeking statements of qualifications from qualified design professionals to provide Design and Construction Management Services for the Quail Treatment Plant to Cottam Wells Pumpstations and Pipeline Project(procurement item). The project will consist of approx.. 15,000 ft of 24 Dia. Pipe, two booster pumpstations and a small buffer/holding tank. The following contains information relating to the procurement item required and describes the criteria and selection process the District will use to select a design professional and negotiate a satisfactory contract at a price fair and reasonable to the District. The method of contractor selection has not been determined at this time. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |