Similar Projects
Football Stadium Parking Expansion
Infrastructure
Conception
$4,700,000 est. value
Paradise, CA 95969

2025 Road Rehabilitation - 50494 - City of Chico
Infrastructure
Conception
$2,700,000 est. value
Chico, CA 95928

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Gold Flat Campground Upgrades
Renovation
Results
$700,000 to $1,100,000 est. value
Oroville, CA 95966

Place Hot Mix Asphalt (Type A) and Replace AC Surfacing
Infrastructure
Results
$1,500,000 est. value
Forest Ranch, CA 95942

2027 Road Rehabilitation - 50560 - City of Chico
Infrastructure
Conception
Chico, CA

On-System Roadway Rehabilitation Skyway
Infrastructure
Post-Bid
$6,790,000 est. value
Paradise, CA

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

State Route 32 Widening Phase 3 - 50475 - City of Chico
Infrastructure
Conception
$816,353 est. value
Chico, CA 95928

2022 Road Rehabilitation
Infrastructure
Results
$600,000 est. value
Chico, CA

2023 Road Rehabilitation - 50492 - City of Chico
Alteration
Conception
Less than $2,650,000 est. value
Chico, CA 95928

Road Rehabilitation Project
Infrastructure
Results
$3,500,000 est. value
Paradise, CA 95967

Main and Broadway Reconfiguration - 50452 - City of Chico
Infrastructure
Conception
$800,000 est. value
Chico, CA 95927

Reported 06/17/2022 10:57 AM
Project Title

Sycamore Creek Bicycle Path I - U13046 - City of Chico

Physical Address View project details and contacts
City, State (County) Chico, CA 95928   (Butte County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $509,275
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 12-foot wide Class 1 bicycle path along the southwesterly crown of the levee that was constructed as part of the Sycamore/Mud Creek Flood Control Project. The bicycle path would begin at the Five-Mile Diversion Dam, cross Wildwood Avenue, and terminate at Foothill Park Subdivision near Marigold Avenue. Project is identified in City's Bicycle Plan. It is also a priority project designated by the Bicycle Advisory Committee. No construction funding identified. The project is included in the City of Chico's FY 2021-2032 Capital Improvement Program (CIP). As of June 16, 2022, information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents