Similar Projects
Last Updated | 09/10/2020 04:12 PM |
Project Title | FFY2018 CDBG Neighborhood Revitalization Project |
Physical Address | View project details and contacts |
City, State (County) | Milton, FL (Santa Rosa County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $700,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of the following three phases: 1. Constructing of approximately 2,720 LF of 6 C-900 PVC water main, 980 LF of 4 PVC water main and the installation of valves, fittings, hydrants, water services and other accessory material necessary for a complete and operational distribution water main. 2. Upgrades and modifications to the storm drainage system at N. Byrom Street and Applegate Street consisting of removal of approximately 200 LF of 12 RCP, and the installation of 300 LF of 24 RCP, 150 LF of 18 RCP, ditch bottom inlets, stormwater pond minor modifications and other material necessary for a complete and operations stormwater system. 3. Resurfacing of approximately 5,890 LF of roadways including N. Byrom Street, Plymouth Street, Applegate Street, Dearborn Street, Peachtree Street and Walker Street as shown on the drawings. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |