Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Production Avenue Extension and Fred Madison Realignment
Post-Bid
Bowling Green, KY

Portable Toilets/Hand washing
Alteration
Post-Bid
Bowling Green, KY

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Pavement (with Alternates)
Results
KY

Warren County Road
Infrastructure
Post-Bid
Bowling Green, KY 42101

Asphalt Surfacing Ultra Thin
Results
KY

Improve Site Rear Plaza
Infrastructure
Post-Bid
Bowling Green, KY 42101

Asphalt Resurfacing
Results
KY

Street Repair/Resurfacing
Infrastructure
Post-Bid
Oakland, KY

Asphalt Surface With Grade and Drain
Results
KY

Street Cut Repairs
Infrastructure
Post-Bid
Bowling Green, KY

ADA Sidewalk Improvements
Results
Bowling Green, KY

Disaster Debris Monitoring Services
Alteration
Post-Bid
Bowling Green, KY

Bowling Green Downtown Improvements Phase II
Results
Bowling Green, KY

Reported 02/17/2022 12:00 AM
Project Title

Storm Related Right-Of-Way Repairs

Physical Address View project details and contacts
City, State (County) Bowling Green, KY 42101   (Warren County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Fencing, Paving/Reconstruction, Service/Term Contracts, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected March 2022, Construction Completion Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Repairs of various assets on or near right-of-way as a result of the tornadoes that occurred on December 11, 2021. The locations identified with this bid (see attached map) are current as of January 19, 2022. However, due to the large amount of debris generated by this storm event, City staff have only been able to inspect a portion of the impacted areas and document damages within right-of-way. The City has contracted debris removal services under an emergency purchase authorization and after approximately one month of debris removal activity, there are still areas where the rights-of-way remain obscured. It is expected additional repairs will be needed once all right-of-ways are cleared, therefore, the successful bidder will remain available to perform other repair activities at the provided unit prices. This bid will include removal and repair of damaged sections of sidewalk, pavement, curb and gutter, and fencing as identified in the bid documents. As noted in the special instructions, the City of Bowling Green typical sections for sidewalk and curb and gutter construction shall be utilized.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents