Similar Projects
The Village at Oakland Park
New Construction
Conception
Oakland Park, FL 33311

Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Thirty-Six
New Construction - 298,892 SF
Design
$10,000,000 CJ est. value
Miami, FL 33142

Wreckers Cay Apartments at Stock Island
New Construction, Demolition - 306,304 SF
Design
Key West, FL 33040

Orlando Tennis Center
Post-Bid
Less than $5,500,000 est. value
Orlando, FL

The Learning Experience
New Construction - 16,323 SF
Post-Bid
$1,425,000 est. value
Palm Beach Gardens, FL 33403

Tree Island Park - Phase 1 Park Development
Results
Less than $4,465,700 est. value
Miami, FL 33194

Julius Guinyard and Adjacent Park Improvement Project
Results
Less than $188,699 est. value
Jacksonville, FL 32202

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

KOA Campground
New Construction
Construction
$3,384,744 est. value
Fort Pierce, FL 34981

Pine Bay
New Construction - 314,568 SF
Conception
$10,000,000 CJ est. value
West Palm Beach, FL 33415

Pawcrest Dog Park Entryway
Post-Bid
Pinecrest, FL 33156

Lake Myrtle Park Sports Complex Expansion Youth Baseball Fields
Results
$7,400,000 est. value
Auburndale, FL 33823

Soleste Spring Gardens
New Construction
Construction
$36,000,000 est. value
Miami, FL

Tennis Court Repair (Recreation and Aquatic Center)
Post-Bid
New Port Richey, FL 34652

Last Updated 07/26/2021 09:41 AM
Project Title

Mcknight Park Clay Tennis Courts Resurfacing

Physical Address View project details and contacts
City, State (County) Rockledge, FL 32955   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Court size is 110’ (one hundred-ten feet) by 110’ (one hundred-ten feet) a total of four (4) tennis courts. 2. Full removal of the 3” to 4” layer of old clay material will be removed the tennis courts. Contractor is responsible for proper removal and off-site disposal. 3. Clay will be replaced with new green clay material between forty (40) to fifty (50) tons of material. 4. All surfaces will be laser graded, rolled/tamped into place with new green clay material. 5. Current irrigation will stay in place for the clay court surface. 6. All fencing for the tennis court renovations will remain in place and only a section will be removed for equipment access. Brevard County will remove the section of fence and put it back when done. 7. All old-line tape will be removed and new added for each of the 4 court surfaces. 8. All court posts will be removed and new added prior to new material being placed. A total of eight posts will be replaced. 9. All new netting will be added by the contractor.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents