Similar Projects
Cedar Park Police Department and Municipal Court Fire Alarm Replacement Project
Bidding
Less than $100,000 est. value
Cedar Park, TX 78613

Smoke/Co and Heat Detector Installation
Term Contract
Post-Bid
Corpus Christi, TX 78408

Fire Alarm System
Post-Bid
Beeville, TX 78102

Fire Extinguishers, Fire Suppression Systems and Services
Results
Granbury, TX

Mezzanine Install Fire Protection
Results
San Angelo, TX 76908

Construction Manager at Risk Fire Station #8
Construction
Less than $7,000,000 est. value
Pearland, TX

Fire Alarm Upgrade
Post-Bid
$1,000,000 to $5,000,000 est. value
Houston, TX

Fire Sprinkler Inspection and Repair
Results
Edinburg, TX

2020 Multiple Campuses Fire Alarm Replacements
Post-Bid
Georgetown, TX 78626

Fort Worth Fire Alarm Replacement
Results
$500,000 to $1,000,000 est. value
Fort Worth, TX 76102

Fire/Security Alarm Access Control Equipment
Post-Bid
Austin, TX 73301

Northeast Campus NFAB Fire Sprinkler Upgrade
Results
TX

Fire Extinguishers Maintenance and Inspection
Term Contract
Post-Bid
Houston, TX 77058

H--Testing for Fire and Radiant Dampers 674-19-2-5065-0813
Results
Temple, TX 76504

AFTF Maintenance and Inspections
Post-Bid
Randolph, San Antonio, TX

Reported 04/06/2021 12:00 AM
Project Title

Fire Sprinkler Installation Project - OC Fisher Federal Building, San Angelo, TX

Physical Address View project details and contacts
City, State (County) San Angelo, TX 76903   (Tom Green County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install a new fire sprinkler system in all the floors, from the basement up to the 3rd floor. In addition to the Fire Sprinkler install, the contractor will repair and replace all damage resulting from the installation. This will apply to all walls, plastered ceilings, suspended ceilings damaged by hangers or cores. This “repair” work will also include painting to match existing texture and color. It may be necessary to “fur out” piping running both vertically and horizontally in areas deemed historically critical.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents