Similar Projects
Milwaukie / El Puente Elementary Safe Routes to School Improvements - City of Milwaukie
Infrastructure
Conception
$5,196,000 est. value
Milwaukie, OR

Portland Properr Hotel
Renovation - 170,000 SF
Design
Portland, OR 97209

US97: Multi-Use Trail (Baker Rd. - Lava Butte)
Alteration
Design
Less than $4,677,093 est. value
Bend, OR 97703

Curb Ramps Project
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Curb Ramps Project
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

2021 Sidewalk Safety Program
Infrastructure
Results
$146,720 est. value
Corvallis, OR 97333

US101: Bunker Hill Sidewalks and Flanagan Signal Project on the Oregon Coast Highway
Infrastructure
Results
OR

OR 202: H.S. to Hanover, Sidewalks (Astoria)
Infrastructure
Design
$3,311,000 est. value
Astoria, OR 97103

2022 ADA Ramp Improvements
Infrastructure
Bidding
$246,867 est. value
Tigard, OR

West Stair Tower Curtain Wall
Alteration
Post-Bid
Eugene, OR 97403

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
OR

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
Tigard, OR 97223

Southwest 3rd and Highway 101 Beacon
Infrastructure
Bidding
$600,000 est. value
Lincoln City, OR

Last Updated 07/12/2022 07:48 AM
Project Title

OR99/OR99W/OR99E Curb Ramps Project

Physical Address View project details and contacts
City, State (County) Roseburg, OR 97471   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

OR99/OR99W/OR99E Curb Ramps Project on Pacific Highway East, Pacific Highway West, and Albany-Junction City Highway (Rt. No. OR99E, OR99W, and OR99) in Harrisburg, Aurora, Monroe, and Junction City

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents