Similar Projects
2021 Sidewalk Repair and Curb Ramp Retrofit Project
Results
Less than $3,209,905 est. value
CO

2021 Miscellaneous Concrete Replacement Project
Infrastructure
Post-Bid
Castle Rock, CO

South Yosemite and County Line Road Signal and Curb Ramp Replacement
Results
Lone Tree, CO

2021 Curb, Gutter and Sidewalk Replacement
Results
Less than $815,102 est. value
Castle Rock, CO

Lincoln Avenue Sidewalk Chambers to Keystone Project
Results
Less than $431,722 est. value
Castle Rock, CO 80104

Elevated Pedestrian Walkways Repairs
Results
$150,000 to $250,000 est. value
Littleton, CO 80126

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

2021 Concrete Replacement
Results
Less than $432,109 est. value
Lone Tree, CO

East-West Regional Trail, Havana Street to Chambers Road
Post-Bid
Castle Rock, CO 80104

2021 Town Facilities Parking Lot Improvement Project
Results
Less than $457,341 est. value
Castle Rock, CO

Parker Downtown Circulation Improvements
Infrastructure
Results
Parker, CO

2021 Concrete Improvements Project
Infrastructure
Post-Bid
Castle Pines, CO 80108

Police Department Parking Lot Improvement Project
Infrastructure
Results
Castle Rock, CO 80104

Parker Road (SH83) Multi-Use Trail (West Side)
Infrastructure
Results
Parker, CO

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

Last Updated 10/07/2021 01:14 PM
Project Title

Trail Over Yosemite Street

Physical Address View project details and contacts
City, State (County) Castle Rock, CO   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,531,255
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project also includes caissons, walls, concrete sidewalk, drainage structures, erosion control, traffic control as well as other items. The Project includes the following major items and approximate quantities: " 1124 LF Removal of Curb and Gutter " 2534 LF Removal of Asphalt Mat " 4940 CY Embankment Material (Complete in Place) " 1953 SY Hot Mix Asphalt (Patching)(Asphalt) " 47,438 LB Reinforcing Steel (Epoxy Coated).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents