Similar Projects
Last Updated | 03/31/2023 12:22 PM |
Project Title | Water Treatment Plant Overflow Modification to Raw Water Storage Ponds |
Physical Address | View project details and contacts |
City, State (County) | El Centro, CA 92243 (Imperial County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sewage Treatment Plant, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $357,720 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The general items of work to be done hereunder consist of construction of concrete inlet structures interconnecting ponds, together with construction of concrete discharge swale and its associated trenching and asphalt repair. Work also includes restoring a 1:1.5 slope at the perimeter of the pond utilizing local and imported native material. License Requirements Class A California Contractor's License Bid Valid 120 Calendar Days from Bid Opening Liquidated Damages $1,500 per Calendar Day Project Duration 60 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 01/30/2023 5:00 PM (PST) Contact Info Abraham Campos 760-337-5182 acampos@cityofelcentro.org |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |