Similar Projects
Bar Screen Upgrades
Renovation
Bidding
Wanaque, NJ

2020 Repairs to the Final Clarifiers
Post-Bid
Newton, NJ 07860

Repairs to the Rotating Biological Contactors (RBCS 1C and 1D)
Post-Bid
Newton, NJ 07860

Decant Facility Rehabilitation
Results
Newark, NJ

Plant Improvements Project
Results
Medford, NJ

Substation M and Headworks Reconstruction
Renovation
Construction
Newark, NJ 07105

Wastewater Treatment Plant Rehabilitation
Construction
Elwood, NJ 08217

Digester Flare
Post-Bid
Whippany, NJ 07981

Final Settling Tanks 1 through 16 Improvements
Results
Little Ferry, NJ 07643

Construction Management Services for the Secondary Treatment Sludge Piping Upgrade
Post-Bid
Camden, NJ 08104

Tertiary Treatment Project
Results
Budd Lake, NJ 07828

Maintenance and Repair Sewer Screening Facilities
Post-Bid
Newark, NJ 07102

River Road WWTP Modified Aeration Clarifier No. 2 Improvements Project
Results
$164,430 est. value
Princeton, NJ 08540

Construction of Oxford WWTF Ultraviolet Disinfection
Post-Bid
Oxford, NJ 07863

River Road STP Multiple Hearth Incinerator No.2 Repairs
Results
$108,738 est. value
Princeton, NJ 08540

Last Updated 09/21/2021 02:36 PM
Project Title

Replacement and Upgrade of the 480V Synchronizing and Controls for Three (3) Existing Cogeneration Enginators (Cogens) at the Northern Water Pollution Control Facility

Physical Address View project details and contacts
City, State (County) NJ 08723   (Ocean County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall include, but not be limited to furnishing and installing cabinet-mounted back panels, PLC backplanes, processors, power supplies, 1/0 modules, terminal blocks, ancillary PLC hardware; operator HMI interface screens; generator protection; load sharing and speed control; power regulation; automatic and manual synchronizing capability; panel mounted meters, lamps, selector switches and Cogen engine system interconnection. The work shall include, but not be limited to field investigation, engineering design, preliminary panel design drawing preparation, drawing modification after review by Authority, final as-built drawing submission, panel construction, wiring, installation, PLC programming, factory acceptance testing, installation, commissioning, startup, training, operations and maintenance (O&M) manual preliminary and final submissions, and technical support as described in this Technical Specification and in the Contract documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents