Similar Projects
Water Station Electrical Improvements - Pump and Motor Replacement - All Stations
Infrastructure
Conception
$2,566,741 est. value
Schaumburg, IL

James Street Pump Station and General HVAC, Structural, Electrical, and Mechanical Improvements
Infrastructure, Alteration
Bidding
$903,200 est. value
Plainfield, IL 60544

North Libertyville Estates Levee Relief Well 1 Replacement
Infrastructure
Bidding
Waukegan, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Alaris IV Pumps
Post-Bid
Chicago Heights, IL

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Relief Well Testing and Inspection
Infrastructure
Bidding
Wood River, IL

Procurement Services Office
Post-Bid
Naperville, IL

New Water Treatment Plant for Well House No. 11
New Construction
Results
Freeport, IL

Well No. 9 Project
Infrastructure
Bidding
$100,000 est. value
Rantoul, IL

Well 6 Repairs
Post-Bid
Antioch, IL

Well House No. 3 Improvement
Results
Pearl City, IL

Zone 1 - Statewide Leaking Well Plugging and Restoration Work
Infrastructure
Bidding
$90,000 est. value

Replace Pump 8 and Install New VFD for Pump 13 at the Touhy Avenue Pump Station
Infrastructure
Post-Bid
Niles, IL 60714

Last Updated 07/11/2022 11:47 PM
Project Title

Southwest Waterworks Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Bolingbrook, IL 60490   (Will County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide the replacement of three (3) existing submersible sewage pumps, guide rails and pipes in the wet well; installation of VFD's for new pumps and mixers. Upgrade the existing SCADA system. Work also includes associated conduits, wires concrete pad and earthwork. he Work to be performed under this Contract consists of the upgrading SCADA cabinet, modify existing MCC, installation of 3 pump VFDs and enclosure; installation two mixer VFDs and associated cables, conduits, control and monitor system. 2. It also includes replacing existing three sewerage pumps, accessories, installation of two mixers, installation of Vented Junction boxes and upgrading associated disconnectors, installation of new wires, conduits and modification of existing disconnectors. 3. It also includes installation of sump pumps and replacement of circuit breaker inside valve vault. 4. Installation of new conduits at outside and associated earthworks. 5. Wet well pipe replacement and coating. 6. All other work as shown in engineering plan and the specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents