Similar Projects
New Water Treatment Plant
New Construction
Design
Lancaster, OH

Pump Station Construction
New Construction
Design
$1,500,000 est. value
Middletown, OH

Engle Pump Station Renovations
Renovation
Bidding
$300,000 est. value
Cleveland, OH

Sugar Creek Water Treatment Plant and Wellfield Improvement
Renovation
Bidding
$30,243,000 est. value
Canton, OH

Small Pump Station Improvements
Post-Bid
Less than $800,000 est. value
Miamisburg, OH

Portsmouth Local Protection Project
Post-Bid
$10,000,000 est. value
Portsmouth, OH

Blue Fountain Lift Station Pump Replacement
Results
Gallipolis, OH 45631

Pump Station Replacement for Mumaugh Road and Cable Road
Results
Lima, OH

Choctaw Lake Water Treatment Plant
New Construction - 2,084 SF
Construction
$1,870,000 est. value
London, OH

Booster Station Replacement - Portersville East Branch Water
Construction
$270,000 est. value
Malta, OH 43758

Water Treatment Plant WTP Improvements
Renovation
Bidding
$4,300,000 est. value
Lucasville, OH 45648

Replace and Construct Type III Hydrant Fuel System
New Construction, Demolition
Post-Bid
$10,000,000 to $25,000,000 est. value
Wright Patterson Air Force Base, OH

7th Street Sanitary Sewer Pump Station and Forcemain Project
Results
Waverly, OH

Guernsey Street Water Treatment Plant
Construction
Less than $26,973,000 est. value
OH

Water Treatment Plant Filter Media
Renovation
Bidding
$90,000 est. value
North Hampton, OH

Last Updated 05/06/2022 11:24 AM
Project Title

Smithfield Wastewater Treament Plant and Pump Stations Rehabilitation

Physical Address View project details and contacts
City, State (County) OH   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,125,515
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of rehabilitating the two lagoons at the 110,000 GPD Smithfield Wastewater Treatment Plant, one at a time; removal and disposal of removed sludge; demolition of aeration piping and installation of floating aerators; and UV disinfection system improvements. Work at the nine sewage pump stations consists of rehabilitation or replacement of structures and equipment, and electrical improvements.

Details

Water Treatment Plant, Renovation, Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents