Similar Projects
North Smoky Hills Graveling
Renovation
Post-Bid

Heartland State Trail - Steamboat Loop
Infrastructure
Results
$970,226 est. value
Walker, MN

0.3 MI W of CSAH 10 Bituminous Mill and Overlay
Results
MN

Grading, Bituminous Surfacing, ADA Improvements
Results
MN

LEECH LAKE BAND OF OJIBWE
Infrastructure
Post-Bid
Cass Lake, MN

Shady Hollow Road
Infrastructure
Results
$200,000 est. value
Pillager, MN 56473

2021 Lake Shore Street Improvements (Robinhood Way)
Results
$175,000 est. value
Lake Shore, MN 56468

Paul Bunyan State Trail Crack Sealing
Results
Backus, MN 56435

CR 139 & CSAH 3 Reclamation, Culvert Replacement & Bituminous Patches
Results
MN

Grading and Paving with Culverts and Storm Sewer
Infrastructure
Post-Bid
Walker, MN

Road Maintenance 2021-2022
Term Contract
Results
$100,000 est. value
MN

2021 Gull Lake Trail
Results
$1,700,000 est. value
MN

Grading, Bituminous Mill and Overlay
Results
MN

Grading, Full Depth Reclamation, Bituminous Mill and Resurfacing, Revise Signal System and Bridge No. 11X06 and 11X07
Results
MN

CR 103 - Muck Excavation, Grading, Culvert and Aggregate Base
Infrastructure
Bidding
MN

Last Updated 08/28/2021 02:12 AM
Project Title

Mill, Overlay, Sidewalk and ADA Improvements

Physical Address View project details and contacts
City, State (County) MN   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

S.A.P. 011-614-002 – Mill, Overlay, Sidewalk & ADA Improvements S.A.P. 011-642-003 – Subgrade Correction, Grading, Reclaim, Paving and Culverts S.A.P. 011-643-003, 018-643-003, 018-656-001 – Reclaim & Paving S.A.P. 011-643-004 – Grading, Paving & Culvert Replacements S.A.P. 011-679-002 – Bituminous Mill & Overlay Aggregate Base, Class 5 5,994 TON Aggregate Base, Class 5 Mod 20,580 TON Full Depth Reclamation 125,756 SY Type SP 9.5 Wearing Course Mix (2,B) 34,733 TON

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents