Similar Projects
Lead Based Paint Hazard Control (LBPHC) Program Services Provider
Term Contract
Design
Flint, MI 48502

Wastewater Treatment Plant Improvements - Tawas Utilities Authority
New Construction, Renovation, Infrastructure
Bidding
$11,000,000 CJ est. value
East Tawas, MI 48730

RFQ - Municipal Wastewater and Water Engineering Services
Term Contract
Bidding
Battle Creek, MI 49017

Clamps (Water Service Center) (REBID)
Term Contract
Sub-Bidding
Flint, MI 48502

East Tank Cleaning
Term Contract
Sub-Bidding
Flint, MI 48532

Pest Management
Post-Bid
Flint, MI 48500

Community Homeworks - Vendors for Service Term Contracts
Term Contract
Post-Bid

Catch Basin Cleaning
Results
Traverse City, MI

WWTP Clarifiers Rehabilitation, Contract 2, Construction and Installation
Results
Marshall, MI 49068

Carbon Tank Actuator Replacement
Renovation
Bidding
$300,000 CJ est. value
Bay City, MI 48708

Solid Waste Disposal
Term Contract
Sub-Bidding
Bay City, MI 48708

Pest Control Services
Post-Bid
Jackson, MI

Interlochen State Park - Wastewater Treatment Plant Improvements
Infrastructure
Results
Interlochen, MI 49643

Wastewater Treatment Plant Ultraviolet Disinfection Replacement
Renovation
Bidding
$190,000 CJ est. value
Clare, MI 48617

Penetrating Silane Sealer Material
Term Contract
Sub-Bidding
Lansing, MI 48933

Last Updated 08/04/2022 06:03 AM
Project Title

Water Treatment Plant HVAC Equipment Maintenance

Physical Address View project details and contacts
City, State (County) Owosso, MI 48867   (Shiawassee County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Acceptance Deadline 09/01/2022 03:00 PM EDT Questions are submitted online No (1) The City of Owosso is seeking proposals from qualified contractors to provide an itemized cost for individual unit repairs or equal replacements. A completion date for all equipment listed as not working as of 7/27/2022 must be included. (2) An annual maintenance service agreement proposal for all of the HVAC equipment located in the Water Filtration Plant at 1111 Allendale Ave. is to be included. This service agreement shall clearly identify the types of services to be performed, frequency and rates. Pre-authorization based on submittals are required for any work to be performed. This contract is renewable for up to three (3) years. General Requirements - Insurance Required

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents