Similar Projects
Last Updated | 02/04/2021 08:37 AM |
Project Title | Interstate North Parkway TS170 |
Physical Address | View project details and contacts |
City, State (County) | Sandy Springs, GA (Fulton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall provide the necessary machinery, tools, apparatus, other means of construction, and all materials and labor specified in the Contract Documents or as necessary to complete the City of Sandy Springs Project TS170 Interstate North Parkway Side path Project, to install approximately 3,570 LF of side path, drainage system which includes but not limited to concrete flume and concrete ditch the north side of Interstate North Parkway as well as closed storm water system, retaining walls, street trees and associated improvements. The contractor must perform at least 51% of work, and must be Pre-qualified Prime Contractor listed by the Georgia Department of Transportation. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |