Similar Projects
Last Updated | 08/14/2019 11:36 AM |
Project Title | S--Connecticut Pest Control Services |
Physical Address | View project details and contacts |
City, State (County) | Danbury, New London, Newington, Waterbury, West Haven, Willimantic, Winsted, CT (Fairfield, Hartford, Litchfield, New Haven, New London, Windham Counties) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Purpose The purpose of this contract is to establish an environmentally sound and effective Integrated Pest Management (IPM) program to prevent general arthropod, invertebrate, vertebrate pests and wildlife from adversely affecting the Connecticut VA installations operations and personnel through obtaining pest control services. A contract shall be awarded for a base year (12 months) with four (4) potential annual option years to be exercised at the discretion of the government. Scope and Objectives The contractor shall provide all management, to prevent and control a wide variety of arthropod and vertebrate pests which include but not limited to cockroaches, flies, fruit flies, termites, ants, fleas, bed bugs, stored product pests, silver fish, mosquitoes, mice, rats, bees, and wasps using best practice in our region. There may be a need to eliminate wildlife such as skunk(s), squirrel(s), bird(s), raccoon(s), possum(s) and others. In addition, the contractor will provide tools, supplies equipment, transportation and labor to develop and implement an Integrated Pest Management (IPM) plan. All infestations shall be addressed until pests are eliminated. Inspections shall be conducted daily 7 days a week at the VA West Haven Campus, once a week at the Newington Campus and bi weekly at each of the CBOC locations. with complaints responded to immediately (within 4 hours upon notification from the COR (Contracting Officer s Representative). | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |