Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

Water Line at Vernal Memorial Park
Post-Bid
Vernal, UT 84078

Z--Dino - Design/Build, Replace Water Line
Results
$500,000 to $1,000,000 est. value
Jensen, UT 84035

Cedar City Air Tanker Base Water Pipe Repair
Results
Less than $25,000 est. value
Cedar City, UT

Culinary Water Improvements
Post-Bid
Less than $700,000 est. value
Levan, UT 84639

Bryner Ploutz Pipeline
Results
$50,000 to $100,000 est. value
Helper, UT 55101

18” Well Transmission Pipeline Project - Materials Supply
Post-Bid
Hurricane, UT 84737

Construction of the 2019 Fire Flow Projects
Results
UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

2019 State Street Waterline Replacement
Results
Less than $1,200,000 est. value
Murray, UT 84107

400 East 540 North to Center Street Culinary Waterline
Post-Bid
$250,000 est. value
Centerville, UT

Decommissioning Water Systems
Results
$50,000 to $100,000 est. value
Price, UT 84501

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

Reported 02/01/2020 12:00 AM
Project Title

Excavation and Water System Repair Services

Physical Address View project details and contacts
City, State (County) Park City, UT 84060   (Summit County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualifications and rates from qualified firms for excavation and water system repair, replacement, maintenance, and similar services for the purpose of providing routine and emergency services. Routine work is work that can be scheduled with the contractor within a two (2) week window and shall commence only after City staff approve a written quote. Emergency work requires the contractor to be on site within a two (2) hour period after being notified and respond on a time and materials basis without providing a prior written quote for the work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents