Reported | 09/02/2021 12:00 AM |
Project Title | Springfield Creek Interceptor Sewer Phase 1A |
Physical Address | View project details and contacts |
City, State (County) | Papillion, NE (Sarpy County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $18,000,000 to $20,000,000 |
Plans Available from | Architect/Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes the following Work: Furnishing and installing approximately 3.25 miles of gravity wastewater interceptor sewer, ranging in pipe size from 24 IN up to 36 IN in diameter; furnishing and installing approximately 3.25 miles: of 24 IN Cooling Water Blowdown (CWB) sewer; and construction of an earthen, clay lined, CWB Equalization Basin and outfall sewer. Work will be constructed complete with sanitary manholes, air release structures, testing, connection to the existing piping, eight (8) bored roadway crossings via pilot-tube auger boring ranging in length from 130 to 340 LF, two (2) tunneled crossings via micro tunneling approx. 670 LF in length, stream crossings, seeding and restoration |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |