Similar Projects
West City Line to CSAH 2 - Wright County
Infrastructure
Conception
$522,000 CJ est. value
Maple Lake, MN 55358

West City Line to CSAH 2 - Wright County
Infrastructure
Conception
$522,000 CJ est. value
Maple Lake, MN 55358

Reconstruction
Infrastructure
Design
$9,100,000 CJ est. value
Buffalo, MN 55313

Reconstruction
Infrastructure
Design
$9,100,000 CJ est. value
Buffalo, MN 55313

Wastewater Treatment Facility Upgrade
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Saint Michael, MN 55376

Wastewater Treatment Facility Upgrade
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Saint Michael, MN 55376

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Fallon Avenue NE Reconstruct
Infrastructure
Results
Monticello, MN 55362

Newcomb Avenue Resurfacing
Infrastructure
Results
$111,420 est. value
Cokato, MN 55321

Advanced Volumetric Alliance Factory
New Construction, Infrastructure - 180,000 SF
Construction
$10,000,000 CJ est. value
Albertville, MN

CSAH 37 Reconstruction Project
Infrastructure
Construction
$6,789,521 CJ est. value
Maple Lake, MN 55358

Monticello Meadow Townhomes
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

Monticello Meadow Townhomes
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

TH 25 to CSAH 14 - Wright County
Infrastructure
Conception
$603,000 CJ est. value
Maple Lake, MN 55358

Last Updated 03/24/2023 01:34 AM
Project Title

2023 Street Improvements

Physical Address View project details and contacts
City, State (County) Maple Lake, MN 55358   (Wright County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $903,299 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general and pursuant to Minnesota Statutes, chapter 429, the work consists of the construction of storm sewer improvements and street construction with approximately the following quantities: 110 LF 15" & 18" RC Storm Sewer Pipe 1,240 LF 6"-8" PVC Watermain Pipe, open-cut 344 LF 6" PVC Watermain Pipe, directional drilled 2,500 LF 4" Drain Tile 5,700 SY Bituminous Reclamation 6,000 CY Common Excavation 1,550 CY Aggregate Base 3,000 CY Select Granular Borrow 5,750 SY Geotextile Road Fabric 1,250 TN Bituminous Course Mixtures 2,500 LF Concrete Curb and Gutter 9,000 SF Concrete Flatwork And other Miscellaneous restoration items. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 90 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 90 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contracto

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents