Similar Projects
Contract No. 1 - Rt 9 Pump Station Rehabilitation
Infrastructure
Bidding
$2,000,000 CJ est. value
Martinsburg, WV 25401

Davis #1 Well Plugging Project
Infrastructure
Bidding
$200,000 CJ est. value
Rosedale, WV 26636

Biennial Construction and Maintenance Contract
New Construction, Infrastructure
Post-Bid
Charleston, WV

Midway Pump Station Building
New Construction
Post-Bid
Bluefield, WV

Inflow and Infiltration Rehabilitation
New Construction
Results
Charleston, WV

Water System Improvements
New Construction
Results
$9,255,000 est. value
Fairmont, WV 26554

GENO #7 Well Plugging Project
Infrastructure
Bidding
$200,000 CJ est. value
Charleston, WV 25301

Alum Creek Lift Station Pump and Control Panel
New Construction
Post-Bid
$300,000 est. value
South Charleston, WV

Gerrardstown Pump Station, Forcemain and Wastewater Treatment Plant Decommission Project
New Construction
Results
Charleston, WV

Multi-Well Federal Plugging Contract Region IV
Infrastructure
Post-Bid
$400,000 CJ est. value
Charleston, WV 25301

Lift Station Improvements
New Construction
Results
$1,200,000 est. value
Charleston, WV

11th Street Pump Station Stabilization
Infrastructure
Results
Huntington, WV 25701

Contract IIIG Wastewater Collection and Treatment System Improvements
Alteration
Results
$8,995,000 est. value
Wheeling, WV

Franklin Elementary Sewer Extension
Renovation, Infrastructure
Results
Wellsburg, WV 26070

SAPP's Run and State Route 73 Sewage Lift Station Replacements
New Construction
Results
Fairmont, WV

Last Updated 09/16/2022 09:01 AM
Project Title

Coonskin Golf Course Irrigation Pump Station - Re-Bid

Physical Address View project details and contacts
City, State (County) Big Chimney, WV 25302   (Kanawha County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $150,009 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this special provision shall consist of furnishing all materials, equipment and labor necessary to construct the pump system in conformance with the details on the Project Plans, in accordance with these special provisions, the plans and details and as directed by the owner. This specification describes a variable frequency drive controlled centrifugal pump station. Design, manufacture, and testing are the sole responsibility of the selected pump station manufacturer. The pump station is to provide water to the irrigation system while simultaneously maintaining a constant discharge pressure by using a prefabricated pump station with variable frequency drives for pressure regulation, under varying flow conditions up to the maximum specified capacity and will be UL QCZJ - "Packaged Pumping System." Pump system equipment, start-up, training, close-out packages, clean-up and guarantees are a part of this item. The Pump System shall be constructed in accordance with the details shown on the project plans, except as specified herein. The prefabricated pump station is to have, at the station discharge isolation valve, the volumetric flow rate and pressure stated in the technical specifications. Centrifugal pumps shall be constructed on a manifold to enable a variable frequency drive to sequentially start the pumps in order to maintain the necessary flow volume at design pressure. The main pumps are to operate at no more than 3,600 RPM. The station shall be completely wired, piped, hydraulically, electrically, and flow tested to full station capacity at factory prior to shipment to job site. Construction shall include a fabricated steel plate and skid assembly to support all components during shipping and to serve as the installation mounting base. The pump station shall include multiple VFD's one (1) per motor for proper operation. Job Completed by September 15, 2022 Questions Regarding Specifications: Jeff Hutchinson, Executive Director Recreation Commission 375 Henry C Hoppy Shores Drive Charleston, IAA/ 25302 Telephone (304) 533-6570 Questions Regarding Bid Submission: Jerie Whitehead Kanawha County Commission 407 Virginia Street, East Charleston, WV 25301 Email: jeriewhitehead@kanawha.us

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents