Similar Projects
Roster of Architectural and Engineering Firms
Infrastructure
Bidding
WA 98203

S Lake Stevens Rd Multi-Use Path Phase II
Term Contract
Bidding
$3,000,000 est. value
Lake Stevens, WA

Professional Engineering, Architectural And Land Surveying Services - Sultan School District
Renovation, Infrastructure, Alteration
Post-Bid
Sultan, WA 98294

Surveying and Mapping for Future Waterline Replacement Projects
Alteration
Post-Bid
Index, WA 98256

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Electrical Safety Program
Alteration
Bidding
Lynnwood, WA

Irrigation Design, SR 530 Slide Memorial
Alteration
Post-Bid
WA

Port Gardner Storage Facility
New Construction, Infrastructure
Results
Everett, WA 98213

Chennault Beach Drive Drainage Improvements
Alteration
Bidding
Mukilteo, WA 98275

Capital Planning Consulting, Architectural, Engineering, Environmental, & Archaeology Services
Renovation, Term Contract
Post-Bid
Tulalip Bay, WA 98271

Central Marina Fuel Dock Design
New Construction, Infrastructure
Results
Everett, WA 98213

Consultant for Electronic Security System Upgrade
Term Contract
Bidding
Everett, WA

Waterfront Place Development Phase II Housing & Commercial Opportunities
New Construction, Infrastructure
Post-Bid
Everett, WA 98213

Scriber Lake Park Boardwalk Trail Design
New Construction, Infrastructure
Results
Lynnwood, WA 98036

Reported 03/16/2022 12:00 AM
Project Title

Everett Transit Inductive Charging Infrastructure Field Installation

Physical Address View project details and contacts
City, State (County) Everett, WA   (Snohomish County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $2,100,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Everett Transit intends to expand their electric bus fleet and charging capacity. In 2021, Everett Transit will purchase nine (9) electric buses capable of using inground inductive chargers. Everett Transit will add six (6) 300kw inground inductive charger systems as follows: College Station, Everett Station, and Seaway Transit Center. The project will install six (6) 300kw in ground inductive chargers at College Station, Everett Station, and Seaway Transit Center, with two (2) at each location. The work will include utility vault, electrical switch box, saw cutting, trenching, conduit, and concrete work. List and identify all system components and their installation requirements and locations, to include, but not limited to: Concrete work and platform requirements for all components, Conduits and conduit runs, Trenching and boring requirements, Transformer, switch box(s), vaults, etc.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents