Similar Projects
Reported | 03/16/2022 12:00 AM |
Project Title | Everett Transit Inductive Charging Infrastructure Field Installation |
Physical Address | View project details and contacts |
City, State (County) | Everett, WA (Snohomish County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | $2,100,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Everett Transit intends to expand their electric bus fleet and charging capacity. In 2021, Everett Transit will purchase nine (9) electric buses capable of using inground inductive chargers. Everett Transit will add six (6) 300kw inground inductive charger systems as follows: College Station, Everett Station, and Seaway Transit Center. The project will install six (6) 300kw in ground inductive chargers at College Station, Everett Station, and Seaway Transit Center, with two (2) at each location. The work will include utility vault, electrical switch box, saw cutting, trenching, conduit, and concrete work. List and identify all system components and their installation requirements and locations, to include, but not limited to: Concrete work and platform requirements for all components, Conduits and conduit runs, Trenching and boring requirements, Transformer, switch box(s), vaults, etc. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |