Similar Projects
VSD Ruth Bader Ginsburg (RBG) High Speed Connectivity
Renovation
Design
$150,000 CJ est. value
Vancouver, WA 98662

WCC Fire Alarm System Improvements
Renovation
Sub-Bidding
$820,000 CJ est. value
Shelton, WA 98584

Well 1 Electrical Improvements
Renovation
Sub-Bidding
$36,000 CJ est. value
Maple Falls, WA 98266

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

MHR Residential Electrical
Alteration
Post-Bid
Puyallup, WA

Bellevue Library Elevator Modernization for Car #3
Alteration
Results
Bellevue, WA 98007

Vehicle Gate Electrical Power
Alteration
Results
Vancouver, WA 98661

Electrical Construction Work Order 2021-2022
Term Contract, Alteration
Post-Bid
WA

51st Circle Generator Purchase and Installation
Alteration
Results
$500,000 to $550,000 est. value
Vancouver, WA 98661

Truax Well Back-up 150 KW 277/480V Generator and Auto Transfer Switch
Alteration
Post-Bid
Tekoa, WA

115Kv Transmission Steel Poles and Caissons for North Stanwood Camano Island Project
Infrastructure
Results
Stanwood, WA 98292

Electric Work
Alteration
Post-Bid
Kennewick, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Pedestal and Electrical Improvements
Alteration
Post-Bid
WA

Pierce County Three Sisters Radio Site - Generator Relocation and Contaminated Soil Cleanup
Alteration
Results
$350,000 est. value
Carbonado, WA 98323

Last Updated 09/02/2022 09:01 PM
Project Title

Pioneer Turko Fiber Construction project

Physical Address View project details and contacts
City, State (County) Seabeck, WA 98380   (Kitsap County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Public Utility District No. 1 of Kitsap County (Kitsap PUD) will receive sealed proposals for bid TEL-260301 Pioneer Turko Fiber Construction Project Bids are being asked for provision of all necessary labor, equipment and materials required for the installation of the District provided fiber cables from Kitsap PUD's existing splice case on Seabeck Hwy NW to the Kitsap PUD's Water Site on Turko Ln NW. Installing Kitsap PUD provided vaults, pedestals, and multi-port terminals (MPT). Contractor will be required to provide all 2" conduit, as indicated in the drawings and other specifications which can be found on the Kitsap PUD Portal Point of contact for questions is Jim LeCompte, Outside Plant Engineer of Kitsap PUD at telecombid@kpud.org.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents