Similar Projects
Music Conservatory Facilities Improvement and Upgrades
New Construction - 3,500 SF
Design
$1,000,000 est. value
White Plains, NY 10606

The Learning Experience
Build-Out - 9,998 SF
Post-Bid
Orangeburg, NY 10962

Construction Management Services
Post-Bid
Highland, NY

Troy Enlarged City School District - Reconstruction at Multiple Buildings Phase 2
Results
Troy, NY 12180

Troy Enlarged City School District - Reconstruction at Multiple Buildings Phase 2
Results
Troy, NY 12180

Beekman CSD - Additions and Alterations Phase III
Construction
$6,625,000 est. value
West Chazy, NY

Beekman CSD - Additions and Alterations Phase III
Construction
$6,625,000 est. value
West Chazy, NY

Charter School &Sports Field
Renovation
Pending Verification
Yonkers, NY 10701

Kingston High School at Phase 2 Renovations and Alterations
Renovation
Post-Bid
Kingston, NY

High School Building D Renovations, Seely Elementary Toilet Renovations & Greenville Elementary Ceiling Abatement and Tile Replacement
Renovation
Results
$845,000 est. value
Scarsdale, NY 10583

Mandela School Additions and Alterations
Construction
Mount Vernon, NY 10550

Construction Management Services
Post-Bid
Poughkeepsie, NY

Menands UFSD 2016 Capital Project
Results
$7,205,000 est. value
Menands, NY 12204

Parsons Memorial Elementary School Additions and Alterations
Addition - 4,167 SF
Construction
$3,850,000 est. value
Harrison, NY 10528

Kingston City School District - Capital Improvements
Post-Bid
Less than $10,800,000 est. value
Kingston, NY 12401

Last Updated 01/12/2021 09:33 AM
Project Title

Cairo-Durham CSD - Additions and Alterations School District Buildings

Physical Address View project details and contacts
City, State (County) Cairo, NY 12413   (Greene County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,725,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 1 - General Construction - $9,900,000 Contract 2 - Plumbing Construction - $775,000 Contract 3 - Mechanical Construction - $3,400,000 Contract 4 - Electrical Construction - $2,000,000 Contract 5 - Communications Cabling Construction - $300,000 Contract 6 - Roofing Construction (Elementary School Only) - $350,000 Work includes at the Middle/High School: General Construction: Reconstructing asphalt parking lot to create a new bus drop off loop and student drop off area including additional parking spaces and sidewalks. Reconstructing asphalt access road to building. Reconstructing student asphalt area by cafeteria. Reconstructing existing track and relocating track events. Reconstruction athletic field inside track including regrading field. Installing new bleachers and walkway at track and athletic field. Installing new asphalt parking at baseball field. Reconstruction and alteration work to classrooms spaces, administration spaces, and other building rooms throughout the building. Building a new addition, canopies, and bench seating to the front of building. This work includes asbestos abatement, demolition work, concrete work, structural steel work, new walls, windows, curtain walls, curtain walls, doors, door hardware, flooring, finishes, roofing work, installing casework, built-in equipment, display cases, marker boards, and tack boards. Work also includes work that needs to be performed in order for other contractors to complete their work. Plumbing Construction: Work includes providing plumbing fixtures, valves, pumps, and piping related to completing the work listed above in the General Construction Contract. Work also includes work that needs to be performed in order for other contractors to complete their work. Mechanical Construction: Work includes providing new piping, valves, ductwork, controls, mechanical units, dust collector and all accessories related to completing work listed above in the General Construction Contract. Work also includes work that needs to be performed in order for other contractors to complete their work. Electrical Construction: Work includes providing wiring, conduits, electrical panels, transformers, lighting fixtures, Site lighting, removing existing light fixtures and reinstalling fixtures, installing new generator, fire alarm system, PA system security system related to completing work listed above in the General Construction Contract. Work also includes work that needs to be performed in order for other contractors to complete their work. Communications Cabling Construction: IT cabling and equipment for new work throughout the renovation space. Work includes at the Elementary School: General Construction: Installing new asphalt parking lot with site lighting. Renovate four gang toilet rooms (2 boys toilet rooms, 2 girls toilet rooms). Renovate nurse’s suite including an ADA toilet room. Installing new ADA lift at stage in gym/auditorium. Demolition work and asbestos abatement work related to completing work above. Mechanical Construction: Installing air conditioning throughout building. Provide exhaust related to toilet renovations. Plumbing Construction: Providing all plumbing work related to renovating toilet rooms and nurse’s suite and air conditioning work. Electrical Construction: Provide all electrical work related to all work be mechanical and general construction work including, site lighting, PA System and fire alarm system. Roof Construction: Provide reconstructive roof work at the elementary school, inclusive of roof penetrations as may be required by other contracts. Communications Cabling Construction: IT cabling and equipment for new work throughout the renovation space.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents