Similar Projects
Replacement of Bathroom Fans
Bidding
Less than $40,000 est. value
New Bedford, MA

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Remove Two Existing Roof-Top Mechanical Units From Roof Of Fairhaven High School Gymnasium And Replace With Two New Hvac Roof-Top Units - General Bids
Post-Bid
$265,000 est. value
Fairhaven, MA 02719

Plymouth Street Fire Improvements: Roofing, HVAC and Windows - Filed Sub-Bids
Results
$700,000 est. value
Mansfield, MA 02048

Heating System On-Call Routine and Emergency Repair Services
Results
Less than $77,000 est. value
New Bedford, MA

Remove Two Existing Roof-Top Mechanical Units From Roof Of Fairhaven High School Gymnasium And Replace With Two New Hvac Roof-Top Units: Hvac - Filed Sub-Bids
Post-Bid
Fairhaven, MA 02719

Installation of Emergency Vehicle Exhaust Fume Removal System
Results
North Dighton, MA 02764

Annual HVAC Preventative Maintenance and Repair Services
Term Contract
Post-Bid
North Attleborough, MA

Mansfield High School Window and Door Replacement - Filed Sub Bid
Results
Less than $1,678,587 est. value
Mansfield, MA

Brewster Mini - TRD HVAC
Post-Bid
Taunton, MA

Emergency Exhaust Fume Removal System
Results
Less than $40,000 est. value
North Dighton, MA 02764

HVAC Cleaning at Taunton State Hospital
Post-Bid
Taunton, MA

Air Conditioning Replacement at Capron Park Zoo
Results
Less than $20,000 est. value
Attleboro, MA 02703

HVAC/R Services
Term Contract
Post-Bid
Less than $2,000,000 est. value

Lawler Library - HVAC System Replacement
Results
Less than $84,000 est. value
New Bedford, MA

Last Updated 01/23/2019 09:25 AM
Project Title

Source Capture Emergency Vehicle Exhaust Fume Removal System for Fire Station 3

Physical Address View project details and contacts
City, State (County) East Freetown, MA 02717   (Bristol County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The contractor shall modify tail pipes as required to accommodate tail pipe nozzle supplied with source capture emergency vehicle exhaust system. Contractor shall provide and install a pneumatic nozzle type source capture emergency vehicle exhaust fume removal system for a total of three (3) ire apparatus vehicles in a drive through bay style ire station. Three (3) ire apparatus with under carriage exhaust systems shall use a pneumatic sliding rail system for drive through bays approximately forty five (45) feet long. Contractor shall provide and install one (1) automatic start control panels listed by UL in accordance with Underwriters Laboratories standard UL-508 as outlined in the equipment specifications. Contractor shall provide and install one (1) exhaust blowers as outlined in the equipment specifications. Contractor shall provide and install one (1) air filtration system to reduce the diesel exhaust particulate (soot) from the exhaust blower discharge.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents