Similar Projects
Yeater Center Chilled Water Piping Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Sedalia, MO 65301

Plumbing Services for the Philips Park Pavilion
Term Contract
Post-Bid
Columbia, MO 65201

Facilities Maintenance Services
Infrastructure, Alteration
Post-Bid
Saint Louis, MO

Mechanical/Plumbing /HVAC Insulation Services
Alteration
Results
Columbia, MO

District Wide Drinking Fountain/Bottle Filler Installation
Alteration
Results
Hazelwood, MO

Plumbing
Renovation
Construction
$16,000 CJ est. value
Saint Charles, MO 63301

At-Risk Construction Management Services
Term Contract
Post-Bid
Blue Springs, MO

McCracken Road Dam Rehabilitation
Infrastructure
Results
$2,000,000 CJ est. value
Ozark, MO 65721

Testing, Adjusting And Balancing Proposal Package 7
Term Contract
Post-Bid
Saint Louis, MO

Installation of Flow Meter
Infrastructure
Results
$126,365 CJ est. value
Saint Louis, MO 63103

Kiel Garage Drain Repairs
Alteration
Post-Bid
Saint Louis, MO 63103

Eltora Wet Weather Storage Facility
Demolition, New Construction, Infrastructure
Results
$187,986 CJ est. value
Saint Louis, MO 63130

Rotary Twist Drain Assembly
Alteration
Post-Bid
Saint Louis, MO

Water Main Improvements Hwy N & Z
Infrastructure
Results
$376,585 CJ est. value
Cottleville, MO 63366

Plumbing Services
Term Contract
Post-Bid
Mexico, MO

Last Updated 04/08/2023 07:32 AM
Project Title

Innsbrook Development Water Tower Contract #2

Physical Address View project details and contacts
City, State (County) Innsbrook, MO 63390   (Warren County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $7,272,500 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new 300,000 gallon elevated water storage tank with sitework, yard piping, access drive and electrical. Questions on the Bid Documents from general contractors and sub-contractors will be answered by the Macon, MO office of the Consulting Engineer. All questions must be submitted using the Request for Information Form (RFI) included in the specifications to Susan Copenhaver of the consulting engineer via e-mail at scopenhaver@mcclurevision.com. Any explanation or interpretation made will be in the form of a written response on the RFI form or by Addendum issued by the Consulting Engineer and furnished to all Bidders identified as plan holders of record. No requests for alternate or "equivalent" products will be considered prior to Bid Opening. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Question Deadline 03/29/2023 Bid Results:- Gallon Composite Water Tower GERARD TANK & STEEL, INC $2,515,000 Gallon Legged Tank GERARD TANK & STEEL, INC. $2,550,000 Gallon Single Pedestal Tank MAGUIRE IRON, INC. $2,207,500

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents