Similar Projects
SR 56 From SR 24 to SR 121 Bypass
Infrastructure
Design
$700,000 est. value
Waynesboro, GA 30830

Construction for East Sparta Bypass Beginning at SR 216 (Shoal Road)
New Construction, Infrastructure
Design
$16,198,387 CJ est. value
Sparta, GA 31087

North Brooks Elementary School Addition
Addition, Demolition, Infrastructure
Bidding
$2,000,000 CJ est. value
Morven, GA 31638

Construction of a Bridge and Approaches on SR 169
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Claxton, GA 30417

Crowning of High School Football Practice Field
Post-Bid
Monticello, GA 31064

Terminal Area Expansion Grading and Drainage Phase 1A
Post-Bid
Dallas, GA 30157

Water Meter ERT's
Results
Douglas, GA

Water Meter Replacement
Results
Lincolnton, GA

SR 59 From Banks County Line to SR 17
Infrastructure
Design
$4,000,000 est. value
Carnesville, GA 30521

T-Hangar Area - Sitework
Infrastructure
Bidding
$400,000 CJ est. value
Woodbury, GA 30293

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

SR59 Water Line Relocation
Infrastructure
Results
$359,354 est. value
Lavonia, GA 30553

SR 30 From Tattnall County Line to E of CS 659 / Cedar Street
Infrastructure
Design
$2,000,000 CJ est. value
Claxton, GA 30417

Construction of a Bridge and Approaches on SR 122
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Barney, GA 31625

T-Hangar Area – Sitework project at the Roosevelt Memorial Airport
Infrastructure
Post-Bid
GA

Last Updated 09/02/2022 09:07 AM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Mount Vernon, GA 30445   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Modifications to existing Well House No. 1 and 2 including demolition, site grading, proposed piping, masonry, electrical, fencing and all apputrenances. Time allotted for construction is 120 consecutive calendar days for substantial completion and 150 days for final completion. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Mount Vernon, in the amount of at least 10% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Mount Vernon. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Mount Vernon as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. The work to be performed under this contract is partially funded with Federal funds from the State Fiscal Recovery Fund (SFRF) Water Sewer Infrastructure Grants established via the American Rescue Plan Act of 2021 and therefore is subject to Federal laws and regulations associated with that program. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents