Similar Projects
New Fire Station - Washington
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Washington, MO 63090

New Fire Station - Washington
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Washington, MO 63090

Highway 47 and Highway 50 Intersection Development
Alteration
Design
$5,300,000 est. value
Union, MO 63084

Agricultural Building - Union R-XI School District
New Construction, Infrastructure - 20,000,000 SF
Design
$5,400,000 CJ est. value
Union, MO 63084

Sanitary Sewer Rehabilitation - CIPP
Infrastructure
Bidding
$500,000 CJ est. value
Union, MO 63084

Water Towers Repair and Maintenance
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Gerald, MO 63037

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Downtown Improvements Phase 1 and Phase 2
Infrastructure
Results
New Haven, MO

Fixed Price Variable Scope Seal Coat
Infrastructure
Results
$250,000 to $500,000 est. value
MO

Lux Living South Kingshighway Boulevard Mixed-Use
Demolition, New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Lux Living South Kingshighway Boulevard Mixed-Use
Demolition, New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Old Pool Renovation - Washington
Renovation, Infrastructure
Conception
$389,000 CJ est. value
Washington, MO 63090

Aurora Estates Senior Living
New Construction, Infrastructure
Design
$11,200,000 CJ est. value
Pacific, MO 63069

Union R-XI High School Greenhouse Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$75,000 CJ est. value
Union, MO 63084

Last Updated 02/22/2023 02:39 AM
Project Title

Riverfront Park Sand Plant Parking Lot Project - City of Washington

Physical Address View project details and contacts
City, State (County) Washington, MO 63090   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined This project is in included in the City of Washington FY 2023-2027 Capital Improvement Plan (CIP). As of February 22, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents