Similar Projects
Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

Waterline Improvement - Kent Drive - City Of Brentwood
Alteration
Conception
$336,000 est. value
Brentwood, CA 94513

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

San Joaquin Pipeline Valve and Safe Entry Improvements - Phase 1B
Infrastructure
Bidding
$14,000,000 est. value
Stockton, CA

Almaden Valley Pipeline Inspection and Rehabilitation Project
Infrastructure
Bidding
$4,000,000 to $6,000,000 est. value
San Jose, CA

Hydrant and Valve Maintenance
Term Contract
Post-Bid
Granite Bay, CA

Fire Flow Improvement Program Ridge Road Pipeline Replacement Project
Infrastructure
Post-Bid
$1,760,000 est. value
Tiburon, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Sub-basin BD Drainage Ditch - 50280 - City of Chico
Infrastructure
Conception
Less than $266,845 est. value
Chico, CA 95927

Repair Storm Damage
Alteration
Design
$2,662,000 est. value
Willits, CA 95490

R Line Upgrade Phase 2 - Salt Creek Project
Infrastructure
Bidding
$800,000 est. value
Imperial, CA

Water Main Capital Improvement
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
Vallejo, CA 94589

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Last Updated 06/17/2022 01:35 AM
Project Title

Friant Kern Canal Pipeline (FKCP) Inlet Valve Replacement

Physical Address View project details and contacts
City, State (County) Fresno, CA   (Fresno County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a water / sewer project in Fresno, California. Completed plans call for the renovation of a water / sewer project. As of 10/29/2020 all bids are rejected. Furnish horizontal in-line 36-inch plunger valve assembly, complete with electric modulating type actuator for flow control and isolation, factory tested, and operable, as shown on Drawings, and as specified herein. This new 36-inch plunger valve assembly will replace an existing 18-inch v-port knife gate valve that is insufficient in its capacity to deliver 38 million gallons per day (MGD) to the Northeast Surface Water Treatment Facility (NESWTF). Liquidated Damages - $ 75 per calendar days All proposals must be made on the Bid Proposal Form provided by the Purchasing Manager. A Bid Deposit, which can be provided separately, in the amount of FIVE HUNDRED DOLLARS ($500.00) in the form of a certified cashier's check, an irrevocable letter of credit, or a certificate of deposit or a bidder's bond executed by a corporate surety, admitted by the California Insurance Commissioner to do business in California, payable and acceptable to the City of Fresno; or the Bidder shall have registered with the Purchasing Manager of the City an annual bid bond sufficient to provide coverage in such amount. Bid Deposits will be refunded after a Contract has been executed with the successful Bidder or all bids have been rejected. Copies of Bid Deposits may be submitted electronically, with the exception of a cashier's check, which must be brought to the Purchasing Manager's office and labeled accordingly with bid number. The City of Fresno hereby notifies all Bidders that no person shall be excluded from participation in, denied any benefits of, or otherwise discriminated against in connection with the award and performance of any contract on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or on any other basis prohibited by law. The meeting room is physically accessible. Services of an interpreter and additional accommodations such as assistive listening devices can be made available. Requests for accommodations should be made at least five working days but no later than 48 hours prior to the scheduled meeting/event. Please contact the Procurement Specialist listed on the cover at 559-621-1332 or through the Questions and Answers field on Planet Bids. The City reserves the right to reject any and all bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents