Similar Projects
Concrete Improvements Rio Salado South Bank Multi use Path (MUP) East Extension
Infrastructure
Bidding
$1,000,000 est. value
Phoenix, AZ 85042

Beale Street Streetscape and Improvements project
Infrastructure
Bidding
$7,000,000 est. value
Kingman, AZ 86401

Cactus Middle School Site Improvements
Post-Bid
Casa Grande, AZ 85122

SCVUSD Parking Lot
Post-Bid
Rio Rico, AZ 85648

The Paseo
Results
Gilbert, AZ 85296

Campus Security Parking Lot Project
Results
Tsaile, AZ 86556

Omega Alpha Academy - Remove and Replace Pavement at School Parking Lot
Infrastructure
Construction
Douglas, AZ 85607

Desert Meadows Pre-K Building and Additional Parking
Addition, Alteration
Construction
Laveen, AZ 85339

Roadway and Parking Lot Crack Seal with Seal Coat Applications
Post-Bid
Prescott, AZ

Bus Bay Improvements
Results
Tempe, AZ 85281

American Disabilities Act Project Upgrades - Phase II
Post-Bid
$500,000 to $750,000 est. value
Chandler, AZ

Community Trail Project
Results
Casa Grande, AZ 85122

Posse Ground Parking and Soldiers Pass SUP Improvements Project
Infrastructure
Post-Bid
$928,124 est. value
Sedona, AZ

Garden Canyon Linear Park St. Andrews Parking Lot Phase 1
Results
Sierra Vista, AZ

Z--Replace Sidewalks for T`Iis Nazbas Com School
Term Contract
Post-Bid
Teec Nos Pos, AZ 86514

Last Updated 05/03/2022 10:12 AM
Project Title

Canyon Del Oro High School East Parking Lot Improvement

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85704   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Administration Drop-Off Lane: a. Remove existing pavement and provide new pavement. b. Associated work as indicated on Drawings. 2. East Parking Lot: a. Remove existing pavement and provide new pavement. b. Regrade as indicated on Drawings. c. Associated work as indicated on Drawings. 3. All other miscellaneous incidental work and coordination not shown that may be required to complete the project. Work may be conducted during school session and as such the General Contractor shall make provisions for separating, with fencing and similar non-traversable barriers, the functioning school facilities including interior corridors, classrooms, exterior walkways and outdoor areas from all construction activities and areas, including but not limited to outdoor equipment, material storage, contractor parking, staging areas and equipment access routes.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents