Similar Projects
Water Treatment Plant Pipe Lining - WTT-CP24-001 - City of Laramie
Renovation, Infrastructure
Conception
$550,000 CJ est. value
Laramie, WY 82070

Secondary Clarifier Mechanism Replacement - WWT-CP24-010 - City of Laramie
Renovation
Conception
$800,000 CJ est. value
Laramie, WY 82070

2020 Warm Hail Claim Repair Project
Renovation
Post-Bid
$100,000 CJ est. value
Gillette, WY 82716

Lagoon Improvements Project, Phase 1
Renovation
Post-Bid
$2,000,000 est. value
Encampment, WY

Filter Backwash Pump Replacement
Renovation
Bidding
$280,000 CJ est. value
Cheyenne, WY 82009

Dry Creek Water Reclamation Facility (DCWRF) Heat Exchanger Replacement Project
Renovation
Bidding
$700,000 CJ est. value
Cheyenne, WY 82007

Waste Water Treatment Plant Digester #2 Cleaning
Renovation
Results
$80,000 est. value
Casper, WY 82609

Wastewater Treatment Plant Rehabilitation Phase II - City of Casper
Renovation
Conception
$3,000,000 CJ est. value
Casper, WY 82601

Wastewater Treatment Plant Concrete Repairs - City of Casper
Renovation
Conception
$1,200,000 CJ est. value
Casper, WY 82601

Wastewater Treatment Plant Motor Control Center - City of Casper
Renovation
Conception
$3,000,000 CJ est. value
Casper, WY 82601

Y--Yell 310402 Rehabilitate/Replace Canyon & Grant Village Wastewater Treatment System, Old Faithful Water Treatment System
Renovation
Post-Bid
$50,000,000 to $90,000,000 est. value
Yellowstone National Park, WY

RFQ Contractor - Rehabilitate/Replace Canyon and Grant Village Wastewater Treatment Systems, Rehabilitate and Improve Old Faithful Water Treatment System
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$90,000,000 CJ est. value
Yellowstone National Park, WY 82190

Dayton Waste Water Treatment Plant Improvements - Phase II
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Dayton, WY 82836

Wastewater Treatment Plant (WWTP) Phase IV Expansion
Addition, Demolition, Infrastructure, Renovation
Post-Bid
$13,576,000 CJ est. value
Teton Village, WY 83025

Last Updated 09/23/2022 03:10 PM
Project Title

Waste Water Treatment Plant Roof And HVAC Replacement - City of Gillette

Physical Address View project details and contacts
City, State (County) Gillette, WY 82718   (Campbell County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP) and funding allotted for FY 23-24 and FY 24-25. As of September 23, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents