Project Title | Christian Hill Paving |
Physical Address | View project details and contacts |
City, State (County) | Delaware Township, PA 18337 (Pike County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Dingman Township Board of Supervisors Christian Hill Road - Full Length: 1616 Tons 9.5mm Superpave Scratch Course in Place, 2425 Tons 9.5mm Superpave Wearing Course in Place, Rolled Bituminous Curbing Where Existing, and 8659 Lf Double Yellow Centerlines and 17,318 Lf White Side Lines. Prevailing Wage Rates and Liquidated Damages Apply. Christian Hill Road - Option 2: 1600 Tons 9.5mm Superpave Scratch Course in Place, 1000 Tons 9.5mm Superpave Wearing Course in Place, Rolled Bituminous Curbing Where Existing, and 5700 Lf Double Yellow Centerlines and 11,400 Lf White Side Lines. Prevailing Wage Rates and Liquidated Damages Apply Bid Proposals Must Be Submitted on Forms Supplied by the Township in a Sealed Envelope Clearly Labeled as "christian Hill Paving Bid", and Must Include Bid Bond in the Amount of Ten Percent (10%) of the Total Bid. The Successful Bidder Shall: (a) Provide Proof of Workers Compensation Insurance and Liability Insurance in an Amount Acceptable to the Board of Supervisors; (B) Be Required to Furnish a Bond Guaranteeing Performance of the Contract and Warranty With Sufficient Surety in the Amount of One Hundred Percent (100%) of the Contract Within Twenty (15) Days After the Contract Has Been Awarded; and (C) Be Required to Furnish a Bond Guaranteeing the Prompt Payment for All Materials Furnished and Labor Supplied or Performed in the Prosecution of the Work Hereunder With Sufficient Surety in the Amount of One Hundred Percent (100%) of the Contract Amount Within Twenty (15) Days After the Contract Has Been Awarded, & Shall Provide That Every Person, Copartnership, Association or Corporation Who, Whether as Subcontractor or Otherwise, Has Furnished Material or Supplied or Performed Labor in the Prosecution of the Work & Who Has Not Been Paid Therefore, May Sue in Assumpsit on Said Additional Bond in the Name of the Township for His, Their, or Its Use and Prosecute Same to Final Judgement for Such Sum or Sums as May Be Justly Due Him, Her, Them or It and Have Execution Thereon, Provided, However, That the Township Shall Not Be Liable for Any Costs of Suit. Upon Failure to Provide Said Bonds, the Award Shall Be Void. The Township Reserves the Right to Reject Any or All Bids, Either in Full or in Part. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |