Similar Projects
Paving of Solid Waste Concrete Drive and Parking
Infrastructure
Results
Hastings, NE 68901

GTS Breach Training Facility
New Construction
Post-Bid
Hastings, NE

Bituminous- S-1D, Trumbull Spur
Infrastructure
Results
Less than $5,000,000 est. value
NE

Parkview Cemetery Paving Phases II and III
Infrastructure
Results
Hastings, NE

CDBG Sidewalks and Curb Ramps Reconstruction
Infrastructure
Results
Hastings, NE

District 4 On-Call Util Location Service
Infrastructure
Results
Less than $5,000,000 est. value

2022 Adams County Resurfacing and Bladen Avenue Reconstruction
Infrastructure
Results
Assumption, NE 68955

Street Improvement District 2022-1
Infrastructure
Results
Hastings, NE

2022 Platte Building Parking Lot Improvements
Renovation, Infrastructure
Results
Hastings, NE 68901

US-281, AYR North and South
Infrastructure
Results
$10,000,000 to $20,000,000 est. value

GTS Transient Training Officers Quarters Construction 640
New Construction - 6,550 SF
Post-Bid
$2,000,000 est. value
Hastings, NE

Lochland Country Club Poolhouse
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Hastings, NE 68901

NEARNG - GTS Headquarters Building Addition and Remodel Project
Addition, Demolition, New Construction, Build-out, Infrastructure - 6,100 SF
Results
$1,020,000 CJ est. value
Hastings, NE 68901

NEARNG - GTS Headquarters Building Addition and Remodel Project
Addition, Demolition, New Construction, Build-out, Infrastructure - 6,100 SF
Results
$1,020,000 CJ est. value
Hastings, NE 68901

WashTech Car Wash / Hastings
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Hastings, NE 68901

Last Updated 08/26/2022 11:05 AM
Project Title

GTS Officers Quarters Building 635

Physical Address View project details and contacts
City, State (County) Hastings, NE 68901   (Adams County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $366,800 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 25, 2022, the project has been cancelled. At this time, it has not been confirmed if the project will be rebid.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents